Filter by category
Filter by Date
Reclassification of a Non-Credible Contingency Event: Eildon PS - Mt Beauty No.1 220 kV line and Eildon PS - Mt Beauty No.2 220 kV line in VIC1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: VIC1
Lines: Eildon PS - Mt Beauty No.1 220 kV and Eildon PS - Mt Beauty No.2 220 kV
Duration: 27/11/2024 13:30 until further notice
Constraint set(s) invoked:
NONE
Auto-generated on behalf of Manager NEM Real Time Operations
[EventId:202411271255_confirmed] Prices for interval 27-Nov-2024 12:55 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1315 hrs on 27 November 2024
PRICES ARE NOW CONFIRMED for trading interval 27-Nov-2024 12:55.
In accordance with Market Notice 121063 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411271315_confirmed] Prices for interval 27-Nov-2024 13:15 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1315 hrs on 27 November 2024
PRICES ARE NOW CONFIRMED for trading interval 27-Nov-2024 13:15.
In accordance with Market Notice 121072 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411271310_confirmed] Prices for interval 27-Nov-2024 13:10 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1315 hrs on 27 November 2024
PRICES ARE NOW CONFIRMED for trading interval 27-Nov-2024 13:10.
In accordance with Market Notice 121071 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411271305_confirmed] Prices for interval 27-Nov-2024 13:05 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1315 hrs on 27 November 2024
PRICES ARE NOW CONFIRMED for trading interval 27-Nov-2024 13:05.
In accordance with Market Notice 121068 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411271300_confirmed] Prices for interval 27-Nov-2024 13:00 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1315 hrs on 27 November 2024
PRICES ARE NOW CONFIRMED for trading interval 27-Nov-2024 13:00.
In accordance with Market Notice 121065 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411271250_confirmed] Prices for interval 27-Nov-2024 12:50 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1315 hrs on 27 November 2024
PRICES ARE NOW CONFIRMED for trading interval 27-Nov-2024 12:50.
In accordance with Market Notice 121061 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
Reclassification of a Non-Credible Contingency Event: Yallourn - Rowville 7 220 kV line and Yallourn - Rowville 8 220 kV line in VIC1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: VIC1
Lines: Yallourn - Rowville 7 220 kV and Yallourn - Rowville 8 220 kV
Duration: 27/11/2024 13:13 until further notice
Constraint set(s) invoked:
V-ROYP78_R_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE
Auto-generated on behalf of Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 28/11/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Periods:
[1.] From 1500 hrs 28/11/2024 to 1600 hrs 28/11/2024.
The forecast capacity reserve requirement is 1176 MW.
The minimum capacity reserve available is 1026 MW.
[2.] From 1700 hrs 28/11/2024 to 1900 hrs 28/11/2024.
The forecast capacity reserve requirement is 1121 MW.
The minimum capacity reserve available is 351 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations