123709MARKET INTERVENTION25/01/2025 03:56:38 PM

Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT

Refer AEMO Electricity Participant Notice 123674

The PPCCGT PELICAN POINT direction is now expected to stay in place until 1400 hrs 26/01/2025.

The direction update is issued at 1600 hrs 25/01/2025.

Manager NEM Real Time Operations
     
123708RESERVE NOTICE25/01/2025 02:29:36 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 28/01/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 123675 is cancelled at 1420 hrs 25/01/2025.

No LOR condition is currently forecast in the STPASA period.

AEMO Operations
     
123707NON-CONFORMANCE25/01/2025 01:10:24 PM

NON-CONFORMANCE Region QLD1 Saturday, 25 January 2025

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Saturday, 25 January 2025

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: YARANSF1
Duration: 25/01/2025 12:40 to 25/01/2025 13:10
Amount: 37 MW
Constraint: NC-Q_YARANSF1

Auto-generated on behalf of Manager NEM Real Time Operations
     
123694RESERVE NOTICE24/01/2025 07:11:31 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 24/01/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 123693 is cancelled at 1910 hrs 24/01/2025.

Manager NEM Real Time Operations
     
123693RESERVE NOTICE24/01/2025 06:16:38 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 24/01/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:


[1.] From 1830 hrs 24/01/2025 to 1900 hrs 24/01/2025.
The forecast capacity reserve requirement is 854 MW.
The minimum capacity reserve available is 816 MW.


Manager NEM Real Time Operations
     
123692GENERAL NOTICE24/01/2025 05:50:25 PM

QNI Minor testing (NSW to Qld) 25th January 2025 for flows from NSW to Qld up to 850 MW

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 117923

There is an opportunity for testing QNI Minor for flows from NSW to Qld up to 850 MW on Saturday 25th January 2025 from 1330 to 1530hrs.

This test includes switching of transmission lines in New South Wales and/or Queensland regions.

Please also refer to the published formal QNI minor testing information at the following link:
https://www.aemo.com.au/consultations/current-and-closed-consultations/qld-to-nsw-interconnector-qni-upgrade

Ben Blake
AEMO Operations
     
123691MARKET INTERVENTION24/01/2025 05:29:53 PM

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

Refer to Market Notice 123623

Direction is cancelled from: 1730 hrs 24/01/2025

Manager NEM Real Time Operations
     
123682RESERVE NOTICE24/01/2025 04:54:49 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 24/01/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 123671 is cancelled at 1645 hrs 24/01/2025.

Manager NEM Real Time Operations
     
123678SETTLEMENTS RESIDUE24/01/2025 04:30:22 PM

[EventId:202501241630_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 24 January 2025 16:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1630 hrs on 24 January 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 24 January 2025.

Refer to market notice: 123670

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1630 hrs on 24 January 2025.

This is an AEMO autogenerated Market Notice.
     