124252SETTLEMENTS RESIDUE06/02/2025 02:30:17 PM

[EventId:202502061430_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 06 February 2025 14:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1430 hrs on 6 February 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 6 February 2025.

Refer to market notice: 124239

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1430 hrs on 6 February 2025.

This is an AEMO autogenerated Market Notice.
     
124239SETTLEMENTS RESIDUE06/02/2025 12:35:26 PM

[EventId:202502061235_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 06 February 2025 12:35

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1235 hrs on 6 February 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 6 February 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1235 hrs on 6 February 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
124238SETTLEMENTS RESIDUE06/02/2025 12:00:25 PM

[EventId:202502061200_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 06 February 2025 12:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1200 hrs on 6 February 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 6 February 2025.

Refer to market notice: 124237

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1200 hrs on 6 February 2025.

This is an AEMO autogenerated Market Notice.
     
124237SETTLEMENTS RESIDUE06/02/2025 10:35:29 AM

[EventId:202502061035_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 06 February 2025 10:35

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1035 hrs on 6 February 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 6 February 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1035 hrs on 6 February 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
124233RESERVE NOTICE06/02/2025 08:47:41 AM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 06/02/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 124225 is cancelled at 0840 hrs 06/02/2025.

Manager NEM Real Time Operations
     
124225RESERVE NOTICE05/02/2025 10:32:28 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 06/02/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 124191 has been updated to the following:

[1.] From 1600 hrs 06/02/2025 to 1730 hrs 06/02/2025.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 887 MW.

[2.] From 1930 hrs 06/02/2025 to 2030 hrs 06/02/2025.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 1148 MW.


Manager NEM Real Time Operations
     
124219RESERVE NOTICE05/02/2025 08:37:04 PM

Cancellation of Actual (LOR1) condition in the NSW region - 05/02/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the NSW region - 05/02/2025

The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.124200 is cancelled at 2019 hrs 05/02/2025.

Manager NEM Real Time Operations
     
124218SETTLEMENTS RESIDUE05/02/2025 07:59:38 PM

[EventId:202502051955_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 05 February 2025 19:55

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1955 hrs on 5 February 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 5 February 2025.

Refer to market notice: 124197

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1955 hrs on 5 February 2025.

This is an AEMO autogenerated Market Notice.
     
124203PRICES SUBJECT TO REVIEW05/02/2025 05:56:18 PM

[EventId:202502051800_review] Prices for interval 05-Feb-2025 18:00 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1755 hrs on 5 February 2025

PRICES ARE SUBJECT TO REVIEW for trading interval 05-Feb-2025 18:00.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
     