Filter by category
Filter by Date
[EventId:202502261545_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 26 February 2025 15:45
Issued by Australian Energy Market Operator Ltd at 1545 hrs on 26 February 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 26 February 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1545 hrs on 26 February 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202502261500_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 26 February 2025 15:00
Issued by Australian Energy Market Operator Ltd at 1500 hrs on 26 February 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 26 February 2025.
Refer to market notice: 125097
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1500 hrs on 26 February 2025.
This is an AEMO autogenerated Market Notice.
Cancellation - AEMO Intervention Event - SA region 25/02/2025
Cancellation - AEMO Intervention Event - SA region 22/02/2025
Refer to Market Notice 125089
The AEMO Intervention Event and all associated directions are cancelled from 1330 hrs on 26/02/2025.
Manager NEM Real Time Operations
Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT
Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 125090
Direction is cancelled from: 1330 hrs 26/02/2025
Manager NEM Real Time Operations
NON-CONFORMANCE Region NSW1 Wednesday, 26 February 2025
NON-CONFORMANCE NSW1 Region Wednesday, 26 February 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: BERYLSF1
Duration: 26/02/2025 12:15 to 26/02/2025 12:40
Amount: 76 MW
Constraint: NC-N_BERYLSF1
Auto-generated on behalf of Manager NEM Real Time Operations
[EventId:202502261235_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 26 February 2025 12:35
Issued by Australian Energy Market Operator Ltd at 1235 hrs on 26 February 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 26 February 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1235 hrs on 26 February 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202502261230_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 26 February 2025 12:30
Issued by Australian Energy Market Operator Ltd at 1230 hrs on 26 February 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 26 February 2025.
Refer to market notice: 125094
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1230 hrs on 26 February 2025.
This is an AEMO autogenerated Market Notice.
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0830 hrs 27/02/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
Manager NEM Real Time Operations
[EventId:202502261135_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 26 February 2025 11:35
Issued by Australian Energy Market Operator Ltd at 1135 hrs on 26 February 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 26 February 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1135 hrs on 26 February 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.