[EventId:202502190930_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 19 February 2025 09:30
Issued by Australian Energy Market Operator Ltd at 0930 hrs on 19 February 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 19 February 2025.
Refer to market notice: 124856
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 0930 hrs on 19 February 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202502190835_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 19 February 2025 08:35
Issued by Australian Energy Market Operator Ltd at 0835 hrs on 19 February 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 19 February 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 0835 hrs on 19 February 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202502181825_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 18 February 2025 18:25
Issued by Australian Energy Market Operator Ltd at 1825 hrs on 18 February 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 18 February 2025.
Refer to market notice: 124852
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1825 hrs on 18 February 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202502181705_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 18 February 2025 17:05
Issued by Australian Energy Market Operator Ltd at 1705 hrs on 18 February 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 18 February 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1705 hrs on 18 February 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202502181600_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 18 February 2025 16:00
Issued by Australian Energy Market Operator Ltd at 1600 hrs on 18 February 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 18 February 2025.
Refer to market notice: 124834
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1600 hrs on 18 February 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202502181505_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 18 February 2025 15:05
Issued by Australian Energy Market Operator Ltd at 1505 hrs on 18 February 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 18 February 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1505 hrs on 18 February 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT
Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 124819
The PPCCGT PELICAN POINT direction is now expected to stay in place until 0400 hrs 20/02/2025.
The direction update is issued at 1600 hrs 18/02/2025.
Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 124767
The TORRB2 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 20/02/2025.
The direction update is issued at 1600 hrs 18/02/2025.
Manager NEM Real Time Operations
Planned outage of South Morang - Sydenham No 1 500 kV line in the VIC region beginning on 21/02/2025.
The South Morang - Sydenham No 1 500 kV in the Victoria (VIC) region is planned to be out of service from 0600 hrs on 21/02/2025 to 1700 hrs on 24/02/2025.
A credible contingency event during this planned outage could cause:
* A large reduction in generation in VIC; and/ or
* Restrict power transfer across the VIC - South Australia (SA) interconnector (Heywood interconnector).
Refer AEMO Network Outage Schedule (NOS) for further details.