[EventId:202503161930_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 16 March 2025 19:30
Issued by Australian Energy Market Operator Ltd at 1930 hrs on 16 March 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 16 March 2025.
Refer to market notice: 125716
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1930 hrs on 16 March 2025.
This is an AEMO autogenerated Market Notice.
NON-CONFORMANCE Region NSW1 Sunday, 16 March 2025
NON-CONFORMANCE NSW1 Region Sunday, 16 March 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: WTAHB1
Duration: 16/03/2025 18:15 to 16/03/2025 18:20
Amount: -10 MW
Constraint: NC-N_WTAHB1
Auto-generated on behalf of Manager NEM Real Time Operations
[EventId:202503161720_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 16 March 2025 17:20
Issued by Australian Energy Market Operator Ltd at 1720 hrs on 16 March 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 16 March 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1720 hrs on 16 March 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202503161430_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 16 March 2025 14:30
Issued by Australian Energy Market Operator Ltd at 1430 hrs on 16 March 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 16 March 2025.
Refer to market notice: 125706
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1430 hrs on 16 March 2025.
This is an AEMO autogenerated Market Notice.
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 16/03/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 125700 has been updated at1415 hrs to the following:
[1.] From 1700 hrs 16/03/2025 to 1930 hrs 16/03/2025.
The forecast capacity reserve requirement is 1720 MW.
The minimum capacity reserve available is 1162 MW.
Manager NEM Real Time Operations
[EventId:202503161405_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 16 March 2025 14:05
Issued by Australian Energy Market Operator Ltd at 1405 hrs on 16 March 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 16 March 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1405 hrs on 16 March 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202503161345_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 16 March 2025 13:45
Issued by Australian Energy Market Operator Ltd at 1345 hrs on 16 March 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 16 March 2025.
Refer to market notice: 125703
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1345 hrs on 16 March 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202503161305_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 16 March 2025 13:05
Issued by Australian Energy Market Operator Ltd at 1305 hrs on 16 March 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 16 March 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1305 hrs on 16 March 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 16/03/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 125698 has been updated at1045 hrs to the following:
[1.] From 1600 hrs 16/03/2025 to 1700 hrs 16/03/2025.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 725 MW.
[2.] From 1830 hrs 16/03/2025 to 2000 hrs 16/03/2025.
The forecast capacity reserve requirement is 1817 MW.
The minimum capacity reserve available is 1159 MW.