Network Augmentation Commissioned - Vic Region - 29/04/2025
Network Augmentation Commissioned - Vic Region - 29/04/2025
At 2030hrs 29/04/2025, the existing Haunted Gully - Tarrone No1 500 kV transmission line has been cut in at Mortlake Power Station to create the following transmission line sections:
Mortlake PS - Tarrone No.1 500 kV transmission line
Mortlake PS - Haunted Gully No.1 500 kV transmission line
Manager NEM Real Time Operations
Release of QNI limit from NSW to Qld - 29th April 2025
Refer to market notice 124749.
AEMO, Transgrid, Powerlink have reviewed the test results following the QNI minor testing on 16th February 2025. The next hold point can now be released.
The hold point of 950 MW from NSW to Qld will be implemented as of 1000 hrs 29th April 2025.
Please also refer to the published formal QNI minor testing information at the following link:
https://www.aemo.com.au/consultations/current-and-closed-consultations/qld-to-nsw-interconnector-qni-upgrade
Ben Blake
AEMO Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 14/04/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1730 hrs 14/04/2025 to 1800 hrs 14/04/2025.
The forecast capacity reserve requirement is 1537 MW.
The minimum capacity reserve available is 1365 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 14/04/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 126538 is cancelled at 1600 hrs 14/04/2025.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 14/04/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1700 hrs 14/04/2025 to 1830 hrs 14/04/2025.
The forecast capacity reserve requirement is 1595 MW.
The minimum capacity reserve available is 1141 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 14/04/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1730 hrs 14/04/2025 to 1800 hrs 14/04/2025.
The forecast capacity reserve requirement is 1632 MW.
The minimum capacity reserve available is 1392 MW.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 14/04/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 1730 hrs to 1800 hrs 14/04/2025.
The forecast capacity reserve requirement is 1680 MW.
The minimum capacity reserve available is 1608 MW.
AEMO Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 10/04/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 126467 is cancelled at 1540 hrs 10/04/2025.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 10/04/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1800 hrs 10/04/2025 to 1830 hrs 10/04/2025.
The forecast capacity reserve requirement is 1595 MW.
The minimum capacity reserve available is 1577 MW.
Manager NEM Real Time Operations