Filter by category
Filter by Date
NEM Local Temperature Alerts for SA, VIC from 03 Jan 2025 to 07 Jan 2025
AEMO's weather service provider has issued forecast temperatures equal to or greater than the NEM Local Temperature Alert Levels for listed weather stations below.
SA
Port Augusta Ap (39+ Deg C): 3rd Jan, 4th Jan, 5th Jan
VIC
Latrobe Valley Ap (39+ Deg C): 5th Jan
Melbourne Olympic Park (39+ Deg C): 4th Jan, 5th Jan
Mildura Ap (39+ Deg C): 4th Jan, 5th Jan
The NEM Local Temperature Alert Levels are:
Launceston Ti Tree Bend: 33 Deg C, Dalby Airport: 37 Deg C, for all other selected weather stations: 39 Deg C.
AEMO requests Market Participants to:
1. review the weather forecast in the local area where their generating units / MNSP converter stations are located and,
2. if required, update the available capacity in their dispatch offers or availability submissions consistent with the forecast temperatures.
Further information is available at:
https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-reliability/projected-assessment-of-system-adequacy/nem-local-temperature-alerts
AEMO Operations Planning
[EventId:202501031000_review] Prices for interval 03-Jan-2025 10:00 are subject to review
Issued by Australian Energy Market Operator Ltd at 0955 hrs on 3 January 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 03-Jan-2025 10:00.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202501030955_review] Prices for interval 03-Jan-2025 09:55 are subject to review
Issued by Australian Energy Market Operator Ltd at 0950 hrs on 3 January 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 03-Jan-2025 09:55.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202501030950_review] Prices for interval 03-Jan-2025 09:50 are subject to review
Issued by Australian Energy Market Operator Ltd at 0945 hrs on 3 January 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 03-Jan-2025 09:50.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202501030945_review] Prices for interval 03-Jan-2025 09:45 are subject to review
Issued by Australian Energy Market Operator Ltd at 0940 hrs on 3 January 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 03-Jan-2025 09:45.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202501030940_review] Prices for interval 03-Jan-2025 09:40 are subject to review
Issued by Australian Energy Market Operator Ltd at 0935 hrs on 3 January 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 03-Jan-2025 09:40.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202501030935_review] Prices for interval 03-Jan-2025 09:35 are subject to review
Issued by Australian Energy Market Operator Ltd at 0930 hrs on 3 January 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 03-Jan-2025 09:35.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
Direction - SA region to Pelican Point Power Limited - PPCCGT PELICAN POINT
Direction - SA region to Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 122451
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to Pelican Point Power Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT at 1630 hrs 02/01/2025
Type of resource: generating unit
Required actions: Remain synchronised and follow dispatch targets at 0700 hrs 03/01/2025
Services provided: Voltage Control
Circumstances necessitating the Direction:Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 1530 hrs 03/01/2025 / further notice.
Pelican Point Power Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT
Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 122666
Direction is cancelled from: 0400 hrs 03/01/2025
Manager NEM Real Time Operations