126722GENERAL NOTICE24/04/2025 03:59:43 PM

Release of QNI limit from NSW to Qld - 29th April 2025

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 124749.

AEMO, Transgrid, Powerlink have reviewed the test results following the QNI minor testing on 16th February 2025. The next hold point can now be released.

The hold point of 950 MW from NSW to Qld will be implemented as of 1000 hrs 29th April 2025.

Please also refer to the published formal QNI minor testing information at the following link:
https://www.aemo.com.au/consultations/current-and-closed-consultations/qld-to-nsw-interconnector-qni-upgrade

Ben Blake
AEMO Operations
     
126715NON-CONFORMANCE24/04/2025 01:55:19 PM

NON-CONFORMANCE Region SA1 Thursday, 24 April 2025

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE SA1 Region Thursday, 24 April 2025

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: BLYTHB1
Duration: 24/04/2025 13:50 to 24/04/2025 13:55
Amount: 143 MW
Constraint: NC-S_BLYTHB1

Auto-generated on behalf of Manager NEM Real Time Operations
     
126690NON-CONFORMANCE23/04/2025 10:00:21 AM

NON-CONFORMANCE Region NSW1 Wednesday, 23 April 2025

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE NSW1 Region Wednesday, 23 April 2025

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: JEMALNG1
Duration: 23/04/2025 08:50 to 23/04/2025 10:00
Amount: 38 MW
Constraint: NC-N_JEMALNG1

Auto-generated on behalf of Manager NEM Real Time Operations
     
126599NON-CONFORMANCE19/04/2025 02:30:19 PM

NON-CONFORMANCE Region QLD1 Saturday, 19 April 2025

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Saturday, 19 April 2025

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: MPP_1
Duration: 19/04/2025 14:20 to 19/04/2025 14:30
Amount: 15 MW
Constraint: NC-Q_MPP_1

Auto-generated on behalf of Manager NEM Real Time Operations
     
126577INTER-REGIONAL TRANSFER16/04/2025 09:33:38 PM

Inter-regional transfer limit variation - Greenbank - Molendinar 8825 275kV line - QLD region - 16/04/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Greenbank - Molendinar 8825 275kV line - QLD region - 16/04/2025

At 2110 hrs 16/04/2025 there was an unplanned outage of Greenbank - Molendinar 8825 275kV line.

The following constraint set(s) invoked at 2120 hrs 16/04/2025
Q-GBMO_8824_8825

This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
     
126558INTER-REGIONAL TRANSFER14/04/2025 05:49:12 PM

Inter-regional transfer limit variation - Collector -Yass 3L 330kV Line - NSW region - 14/04/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Collector -Yass 3L 330kV Line - NSW region - 14/04/2025

A planned outage of the Collector -Yass 3L 330kV Line in the NSW region was scheduled from 0700 hrs 12/04/2025 to 1700 hrs 16/04/2025.

The outage has been completed and the Collector -Yass 3L 330kV Line returned to service at 1735 hrs 14/04/2025

Constraint set(s) revoked: N-CTYS_3L_WG_CLOSE

Manager NEM Real Time Operations
     
126545RESERVE NOTICE14/04/2025 05:18:07 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 14/04/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:


[1.] From 1730 hrs 14/04/2025 to 1800 hrs 14/04/2025.
The forecast capacity reserve requirement is 1537 MW.
The minimum capacity reserve available is 1365 MW.


Manager NEM Real Time Operations
     
126542RESERVE NOTICE14/04/2025 04:06:35 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 14/04/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 126538 is cancelled at 1600 hrs 14/04/2025.

Manager NEM Real Time Operations
     
126538RESERVE NOTICE14/04/2025 01:52:48 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 14/04/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:


[1.] From 1700 hrs 14/04/2025 to 1830 hrs 14/04/2025.
The forecast capacity reserve requirement is 1595 MW.
The minimum capacity reserve available is 1141 MW.


Manager NEM Real Time Operations
     