Filter by category
Filter by Date
[EventId:202503031645_NRM_NSW1_QLD1_started] NEGRES CONSTRAINT NRM_NSW1_QLD1 started operating from 03 March 2025 16:45
Issued by Australian Energy Market Operator Ltd at 1645 hrs on 3 March 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to QLD - 3 March 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to QLD directional interconnector.
The negative residue constraint set NRM_NSW1_QLD1 commenced operating from 1645 hrs on 3 March 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202503031600_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 03 March 2025 16:00
Issued by Australian Energy Market Operator Ltd at 1600 hrs on 3 March 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 March 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1600 hrs on 3 March 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT
Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 125210
PPCCGT PELICAN POINT at 0700 hrs 02/03/2025 to remain synchronised and follow dispatch targets.
The PPCCGT PELICAN POINT direction is now expected to stay in place until 1430 hrs 04/03/2025.
The direction update is issued at 1615 hrs 03/03/2025.
Manager NEM Real Time Operations
[EventId:202503031445_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 03 March 2025 14:45
Issued by Australian Energy Market Operator Ltd at 1445 hrs on 3 March 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 March 2025.
Refer to market notice: 125223
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1445 hrs on 3 March 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202503031405_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 03 March 2025 14:05
Issued by Australian Energy Market Operator Ltd at 1405 hrs on 3 March 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 March 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1405 hrs on 3 March 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202503031400_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 03 March 2025 14:00
Issued by Australian Energy Market Operator Ltd at 1400 hrs on 3 March 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 3 March 2025.
Refer to market notice: 125220
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1400 hrs on 3 March 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202503031305_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 03 March 2025 13:05
Issued by Australian Energy Market Operator Ltd at 1305 hrs on 3 March 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 3 March 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1305 hrs on 3 March 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202503031100_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 03 March 2025 11:00
Issued by Australian Energy Market Operator Ltd at 1100 hrs on 3 March 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 March 2025.
Refer to market notice: 125216
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1100 hrs on 3 March 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202503031100_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 03 March 2025 11:00
Issued by Australian Energy Market Operator Ltd at 1100 hrs on 3 March 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 3 March 2025.
Refer to market notice: 125215
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1100 hrs on 3 March 2025.
This is an AEMO autogenerated Market Notice.