125224SETTLEMENTS RESIDUE03/03/2025 02:45:33 PM

[EventId:202503031445_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 03 March 2025 14:45

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1445 hrs on 3 March 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 March 2025.

Refer to market notice: 125223

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1445 hrs on 3 March 2025.

This is an AEMO autogenerated Market Notice.
     
125223SETTLEMENTS RESIDUE03/03/2025 02:05:26 PM

[EventId:202503031405_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 03 March 2025 14:05

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1405 hrs on 3 March 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 March 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1405 hrs on 3 March 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
125222SETTLEMENTS RESIDUE03/03/2025 02:00:28 PM

[EventId:202503031400_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 03 March 2025 14:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1400 hrs on 3 March 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 3 March 2025.

Refer to market notice: 125220

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.

The negative residue constraint NRM_VIC1_SA1 ceased operating at 1400 hrs on 3 March 2025.

This is an AEMO autogenerated Market Notice.
     
125220SETTLEMENTS RESIDUE03/03/2025 01:05:23 PM

[EventId:202503031305_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 03 March 2025 13:05

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1305 hrs on 3 March 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 3 March 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.

The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1305 hrs on 3 March 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
125219INTER-REGIONAL TRANSFER03/03/2025 11:31:48 AM

Inter-regional transfer limit variation - Halys - Tarong 8868 275 kV Line - QLD region - 03/03/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Halys - Tarong 8868 275 kV Line - QLD region - 03/03/2025

At 1115 hrs 03/03/2025 there was a short notice outage of Halys - Tarong 8868 275 kV Line.

The following constraint set(s) invoked at 1115 hrs 03/03/2025
Q-HATR

This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
     
125218SETTLEMENTS RESIDUE03/03/2025 11:00:25 AM

[EventId:202503031100_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 03 March 2025 11:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1100 hrs on 3 March 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 March 2025.

Refer to market notice: 125216

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1100 hrs on 3 March 2025.

This is an AEMO autogenerated Market Notice.
     
125217SETTLEMENTS RESIDUE03/03/2025 11:00:28 AM

[EventId:202503031100_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 03 March 2025 11:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1100 hrs on 3 March 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 3 March 2025.

Refer to market notice: 125215

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.

The negative residue constraint NRM_VIC1_SA1 ceased operating at 1100 hrs on 3 March 2025.

This is an AEMO autogenerated Market Notice.
     
125216SETTLEMENTS RESIDUE03/03/2025 10:10:31 AM

[EventId:202503031010_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 03 March 2025 10:10

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1010 hrs on 3 March 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 March 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1010 hrs on 3 March 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
125215SETTLEMENTS RESIDUE03/03/2025 09:35:22 AM

[EventId:202503030935_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 03 March 2025 09:35

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0935 hrs on 3 March 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 3 March 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.

The negative residue constraint set NRM_VIC1_SA1 commenced operating from 0935 hrs on 3 March 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.