Consultation timeline
-
Public launch briefing on Draft ISP10 December 2021
-
AEMO Consumer Forum – Discussion of ISP15 December 2021
-
Pre-submission public forum1 February 2022
-
Consumer advocate verbal feedback4 February 2022
-
Submissions close11 February 2022
-
Final 2022 ISP published30 June 2022
The 2022 Integrated System Plan
The 2022 ISP provides a comprehensive roadmap for the National Electricity Market. It draws on extensive stakeholder engagement and power system expertise to develop a roadmap that optimises consumer benefits through a transition period of great complexity and uncertainty.
The ISP and its optimal development path support Australia’s highly complex and rapid energy transformation towards net zero emissions, enabling low-cost renewable energy and essential transmission to provide consumers with reliable, and secure and affordable power. It serves the regulatory purpose of identifying actionable and future ISP projects, as well as the broader purposes of informing market participants, investors, policy decision makers and consumers.
AEMO has published the 2022 Integrated System Plan.
Appendices
-
30/06/2022
A1 Stakeholder Engagement
942.12 KB -
30/06/2022
A2 ISP Development Opportunities
3.37 MB -
30/06/2022
A3 Renewable Energy Zones
10.05 MB -
30/06/2022
A4 System Operability
6.24 MB -
30/06/2022
A5 Network Investments
2.36 MB -
30/06/2022
A6 Cost Benefit Analysis
3.5 MB -
30/06/2022
A7 Power System Security
1.9 MB
Supporting material
-
30/06/2022
ISP Consultation Summary Report
1.4 MB -
30/06/2022
Chart data
2.18 MB -
30/06/2022
Generation outlook
59.17 MB -
30/06/2022
Inputs, assumptions and scenarios workbook
This version contains the latest input data to be used for the 2022 ISP modelling.
9.83 MB -
30/06/2022
Indicative REZ boundaries 2022 – GIS data
54.32 KB -
17/06/2022
Letter - NSW Minister to appoint EnergyCo to develop Sydney Ring projects
759.97 KB
Consultation on the Draft 2022 ISP
The Draft 2022 Integrated System Plan (ISP) was published on 10 December 2021.
AER’s Transparency Review of AEMO Draft 2022 Integrated System Plan was published in January 2022. In response to its recommendations, an Addendum to the 2022 Draft ISP was published on 11 March 2022 to provide additional information on how key inputs and assumptions contribute to the Draft ISP outcomes.
Written submissions
Submissions in response to the Draft 2022 ISP, associated appendices and other material, were invited until 11 February 2022.
The Draft ISP includes consultation questions to guide stakeholder submissions. AEMO also welcomed comment on any aspect of the Draft ISP.
-
15/02/2022
Sligar and Associates
98.2 KB -
15/02/2022
Smart Wires
198.9 KB -
15/02/2022
Snowy Hydro
402.82 KB -
15/02/2022
Star of the South
804.85 KB -
23/02/2022
Tasmanian Minister for Energy and Emissions Reduction
70.48 KB -
15/02/2022
TasNetworks
731.64 KB -
15/02/2022
Tesla
502.71 KB -
15/02/2022
Tilt Renewables
301.3 KB -
15/02/2022
Transgrid
522.35 KB -
15/02/2022
Victoria Energy Policy Centre (VEPC)
503.74 KB
Consultation materials
-
10/12/2021
Draft 2022 Integrated System Plan (ISP)
3.32 MB -
10/12/2021
Draft 2022 Integrated System Plan (ISP) – Overview
778.74 KB -
10/12/2021
Appendix 1: Stakeholder Engagement
868.06 KB -
10/12/2021
Appendix 2: 2022 Draft ISP Development Opportunities
3.13 MB -
10/12/2021
Appendix 3: Renewable Energy Zones (REZ)
5.31 MB -
10/12/2021
Appendix 4: System operability
1.28 MB -
10/12/2021
Appendix 5: Network investments
1.72 MB -
10/12/2021
Appendix 6: Cost-benefit analysis
3.12 MB -
10/12/2021
Appendix 7: Power system security
1.23 MB -
10/12/2021
Draft 2022 ISP chart data
2.11 MB -
28/02/2022
Draft 2022 ISP generation outlook
37.2 MB -
10/12/2021
Addendum to the 2021 Inputs, Assumptions and Scenarios Report
This report contains additional information on key issues discussed in the 2021 Inputs, Assumptions and Scenarios Report.
524.86 KB