2023 Transmission Expansion Options Report Consultation

28/07/2023
Market National Electricity Market
StageFinal Report
ConvenorAEMO NEM
Initiated02/05/2023
Accepting submissions?No

Timeline

  • Publication of the Draft 2023 Transmission Expansion Options Report
    2 May 2023
  • Draft 2023 Transmission Expansion Options Report pre submissions webinar
    18 May 2023
  • Consumer Advocate verbal submission
    19 May 2023
  • Written consultation submissions close
    31 May 2023
  • Publication of the final 2023 Transmission Expansion Options Report
    28 July 2023
  • 2023 Transmission Expansion options Report webinar
    10 August 2023

Matter under consultation

The Integrated System Plan (ISP) is a whole-of-system plan that provides an integrated roadmap for the efficient development of the National Electricity Market (NEM) over at least the next 20 years. As part of the preparation of the 2024 ISP, AEMO is consulting on the Draft 2023 Transmission Expansion Options Report. 

The 2023 Transmission Expansion Options Report explores conceptual transmission network expansion options that could increase the hosting capacity of Renewable Energy Zones (REZs) and the transfer capacity of the backbone of the interconnected network. Exploring these conceptual options and consulting with our stakeholders is key to finalising the inputs that will be used to inform the 2024 ISP.

Draft Transmission Expansion Options Report webinar

AEMO hosted a webinar on Thursday 18 May 2023 to provide information for stakeholders and answer questions about the report.

Submissions