Notice of Final Report and Determination – Regulation FCAS Contribution Factor Procedure
National Electricity Rules Rule 8.9
Date of Notice: 9 November 2018
This notice informs all Registered Participants and interested parties (Consulted Persons) that AEMO has concluded consultation on amendments to the Causer Pays Procedure – renamed to the Regulation FCAS Contribution Factor Procedure. The final report and determination is provided below, along with all submissions received during the two stages of consultation.
This consultation was conducted under clause 3.15.6A(m) of the National Electricity Rules (NER), in accordance with the Rules consultation requirements detailed in rule 8.9 of the NER.
Final Report
- Final Determination - Causer Pays Consultation (693 KB, pdf)
Second Stage Consultation Participant Responses
- Australian Energy Council submission (166 KB, pdf)
- CS Energy submission (585 KB, pdf)
- CS Energy attachment (29 KB, xlsx)
- ERM Power submission (445 KB, pdf)
- Meridian Energy submission (77 KB, pdf)
- Origin Energy submission (198 KB, pdf)
- Tilt Renewables submission (89 KB, pdf)
Draft Report and Procedure
- Draft Determination - Causer Pays Consultation (1.5 MB, pdf)
- Regulation FCAS Contribution Factors Procedure v2 (1.6 MB, docx)
Downloads
- Causer Pays Workshop Minutes March 2017
- Causer Pays Workshop Slides March 2017
- Notice of First Stage Consultation
- Causer Pays Procedures Issues Paper December 2016
First Stage Consultation Participant Responses
- AGL submission
- Australian Energy Council submission
- CS Energy submission
- Energy Australia submission
- ENGIE submission
- ERM Power submission
- Hydro Tasmania submission
- Infigen Energy submission
- Origin submission
- Pacific Hydro submission
- Tilt Renewables submission
- Uniting Communities submission
- Waterloo Wind Farm submission
- Wind Coalition consultant submission (submitted as part of the submissions from Woolnorth Windfarm, Waterloo Windfarm, Infigen Energy and Tilt Renewables)
- Woolnorth Wind Farm submission