2017 Benchmark Reserve Capacity Price
AEMO has completed its draft determination of the 2017 Benchmark Reserve Capacity Price (BRCP). The BRCP for the 2017 Reserve Capacity Cycle will be effective for the 2019-20 Capacity Year, which starts on 1 October 2019 and ends on 1 October 2020.
AEMO proposed a draft value of $145,800 per MW per year for the 2017 BRCP.
AEMO acknowledges the feedback provided by Market Participants and all submissions received can be found below. AEMO will consider all feedback prior to submitting the final report to the Economic Regulation Authority (ERA) for approval.
-
18/11/2016
Draft Report 2017 Benchmark Reserve Capacity Price
1.36 MB -
18/11/2016
2017 BRCP draft calculation spreadsheet
63.38 KB -
18/11/2016
GHD 2017 Benchmark Reserve Capacity Price for the SWIS
759.9 KB -
18/11/2016
Landgate Land values for the 2017 BRCP
288.05 KB -
18/11/2016
PwC debt risk premium
456.66 KB -
08/12/2016
Weighted Average Cost of Capital 2017 BRCP calculation spreadsheet
67.5 KB -
18/11/2016
Western Power Total Transmission Cost estimates
681.6 KB -
07/12/2016
Perth Energy
918.57 KB -
07/12/2016
Tesla
911.68 KB