AEMO has concluded its consultation on the March 2021 amendments to the Electricity Retail Market Procedures as a result of issues which were raised by industry proponents and AEMO.
This consultation was conducted in accordance with the Rules consultation requirements detailed in clause 8.9 of the Rules. Any queries should be directed to AEMO's NEM Retail Procedures Consultation email address, NEM.Retailprocedureconsultations@aemo.com.au.
Consultation timeline
Consultation stage | Indicative date |
---|---|
Issues Paper | Monday, 1 March 2021 |
Submissions Close | Thursday, 22 April 2021 |
Draft Determination | Thursday, 20 May 2021 |
Submissions Close | Friday, 4 June 2021 |
Final Determination | Friday, 16 July 2021 |
Matter under consultation
Final Report and Determination
-
16/07/2021
Final Report and Determination
725.18 KB -
16/07/2021
Guideline for Clarification of the National Measurement Act v1.3 (Clean)
424.07 KB -
16/07/2021
Guideline for Clarification of the National Measurement Act v1.3 (Change Marked)
468.44 KB -
16/07/2021
Metrology Procedure Part A v7.32 (Clean)
462.42 KB -
16/07/2021
Metrology Procedure Part A v7.32 (Change Marked)
456.73 KB -
16/07/2021
Service Level Procedure MDP Services v2.2 (Clean)
632.98 KB -
16/07/2021
Service Level Procedure MDP Services v2.2 (Change Marked)
644.09 KB
Second stage consultation submissions
11 submissions were received from the following parties:
-
09/06/2021
AGL
293.29 KB -
09/06/2021
Ausgrid
295.24 KB -
09/06/2021
CitiPower Powercor
191.49 KB -
09/06/2021
Endeavour Energy
984.59 KB -
09/06/2021
Energy Queensland
347.24 KB -
09/06/2021
Intellihub
289.44 KB -
09/06/2021
Origin Energy
294.59 KB -
09/06/2021
PLUS ES
379.78 KB -
09/06/2021
SA Power Networks
304.61 KB -
09/06/2021
United Energy
191.66 KB -
09/06/2021
Vector Metering
283.44 KB
Second stage consultation documents
Date of publication: 20 May 2021
AEMO invites comments on the proposed changes contained within the Draft Report. Submissions must be made using the response template linked below and sent in PDF and .docx format to NEM.Retailprocedureconsultations@aemo.com.au. Submissions should be forwarded to AEMO by 5:00pm (Melbourne time) on Friday 4 June 2021.
-
20/05/2021
Draft Report
1022.81 KB -
20/05/2021
Response template
45.33 KB -
20/05/2021
Guideline for Clarification of the National Measurement Act (change marked)
476.07 KB -
20/05/2021
Guideline for Clarification of the National Measurement Act (clean)
416 KB -
20/05/2021
Metrology Procedure: Part A - National Electricity Market (change marked)
440.63 KB -
20/05/2021
Metrology Procedure: Part A - National Electricity Market (clean)
454.58 KB -
20/05/2021
Service Level Procedure: Metering Data Provider Services (change marked)
643.79 KB -
20/05/2021
Service Level Procedure: Metering Data Provider Services (clean)
632.95 KB -
20/05/2021
Standing Data for MSATS (change marked)
1.11 MB -
20/05/2021
Standing Data for MSATS (clean)
989.79 KB -
20/05/2021
MSATS Procedures: Consumer Administration and Transfer Solution (CATS) Procedure Principles and Obligation (change marked)
2.59 MB -
20/05/2021
MSATS Procedures: Consumer Administration and Transfer Solution (CATS) Procedure Principles and Obligation (clean)
2.58 MB -
20/05/2021
MSATS Procedures: Procedure for the Management of Wholesale, Interconnector, Generator and Sample (WIGS) (change marked)
1.59 MB -
20/05/2021
MSATS Procedures: Procedure for the Management of Wholesale, Interconnector, Generator and Sample (WIGS) (clean)
1.58 MB
First stage consultation submissions
13 submissions were received from the following parties:
-
03/05/2021
AGL
297.52 KB -
03/05/2021
Alinta Energy
283.9 KB -
03/05/2021
AusNet Services
284.93 KB -
03/05/2021
CitiPower Powercor
209.86 KB -
03/05/2021
Energy Queensland
440 KB -
03/05/2021
Intellihub
268.43 KB -
03/05/2021
Origin Energy
261.76 KB -
03/05/2021
PLUS ES
303.12 KB -
03/05/2021
Powermetric Metering
271.84 KB -
03/05/2021
Red Energy and Lumo Energy
133.02 KB -
03/05/2021
TasNetworks
798.92 KB -
03/05/2021
United Energy
210.31 KB -
03/05/2021
Vector Metering
282.45 KB
First stage consultation documents
AEMO invites comments on the proposed changes contained within the Notice of First Stage of Consultation and Issues Paper. Submissions should be forwarded to AEMO by 5:00pm (Melbourne time) on Thursday 22 April 2021. Submissions must be made using the response template linked below and sent to NEM.Retailprocedureconsultations@aemo.com.au.
-
01/03/2021
Notice of First Stage Consultation
102.42 KB -
01/03/2021
Issues Paper
567.13 KB -
12/10/2021
Response template
43.41 KB -
01/03/2021
Guideline for Clarification of the National Measurement Act (change marked)
415.96 KB -
01/03/2021
Guideline for Clarification of the National Measurement Act (clean)
424.26 KB -
01/03/2021
Retail Electricity Market Procedures – Glossary and Framework (change marked)
584.91 KB -
01/03/2021
Retail Electricity Market Procedures – Glossary and Framework (clean)
613.85 KB -
01/03/2021
Metrology Procedure: Part A - National Electricity Market (change marked)
434.11 KB -
01/03/2021
Metrology Procedure: Part A - National Electricity Market (clean)
447.68 KB -
01/03/2021
Service Level Procedure: Metering Data Provider Services (change marked)
628.24 KB -
01/03/2021
Service Level Procedure: Metering Data Provider Services (clean)
641.48 KB -
01/03/2021
Standing Data for MSATS (change marked)
1.12 MB -
01/03/2021
Standing Data for MSATS (clean)
992.05 KB -
01/03/2021
MSATS Procedures: Consumer Administration and Transfer Solution (CATS) Procedure Principles and Obligation (change marked)
2.59 MB -
01/03/2021
MSATS Procedures: Consumer Administration and Transfer Solution (CATS) Procedure Principles and Obligation (clean)
2.58 MB -
01/03/2021
MSATS Procedures: Procedure for the Management of Wholesale, Interconnector, Generator and Sample (WIGS) (change marked)
1.6 MB -
01/03/2021
MSATS Procedures: Procedure for the Management of Wholesale, Interconnector, Generator and Sample (WIGS) (clean)
1.58 MB
Procedures may be made available in .rtf file formats on request. A summary of the proposed changes is available below:
Procedure | Proposed Implementation Date | Change Type |
---|---|---|
Guideline for Clarification of the National Measurement Act (Measurement Guideline) | 2 August 2021 | Procedure/ supporting document change |
Retail Electricity Market Procedures – Glossary and Framework (Glossary/Framework) | ||
Metrology Procedure: Part A - National Electricity Market (Metrology Procedure: Part A) | 1 May 2022 | |
Service Level Procedure: Metering Data Provider Services (SLP: MDP Services) | ||
Standing Data for MSATS (Standing Data document) | ||
MSATS Procedures: Consumer Administration and Transfer Solution (CATS) Procedure Principles and Obligation (MSATS Procedures: CATS) | ||
MSATS Procedures: Procedure for the Management of Wholesale, Interconnector, Generator and Sample (WIGS) NMIS (MSATS Procedures: WIGS) | Version control only |