AEMO is conducting a consultation on the proposed amendments to various metering procedures to support the implementation of the Five-Minute Rule, scheduled to come into effect 1 October 2021.
The Rule change requires the collection, storage and delivery of revenue metering data based on five-minute intervals for use in energy settlement, network and retail billing.
This consultation is being conducted as per the Rules consultation requirements detailed in clause 8.9 of the Rules.
Any queries should be directed to AEMO's Five-Minute Settlement email address, 5MS@aemo.com.au.
First Stage Consultation Documents
- Notice of Consultation (156 KB, docx)
- Consultation Paper (936 KB, docx)
- Metrology Procedure Part A v7.0 Initial Draft Change Marked (860 KB, docx)
- Metrology Procedure Part B v7.0 Initial Draft Change Marked (961 KB, docx)
- MDFF Specification NEM12 NEM13 v2.0 Initial Draft Change Marked (882 KB, docx)
- MDPP v2.0 Initial Draft Change Marked (840 KB, docx)
- Retail Electricity Market Procedures - Glossary and Framework v3.0 Initial Draft Change Marked (1.0 MB, docx)
- Participant Response Template - First Stage (113 KB, doc)
First Stage Submissions
- AGL (276 KB, pdf)
- Aurora Energy (483 KB, pdf)
- AusNet (425 KB, pdf)
- CitiPower and Powercor (120 KB, pdf)
- Endeavour Energy (32 KB, pdf)
- Energy Queensland (178 KB, pdf)
- Evoenergy (899 KB, pdf)
- Intellihub (747 KB, pdf)
- Jemena (910 KB, pdf)
- Landis+Gyr (272 KB, pdf)
- Momentum (1.0 MB, pdf)
- PlusES (907 KB, pdf)
- Red Energy and Lumo Energy (187 KB, pdf)
- United Energy (121 KB, pdf)
- Vector (876 KB, pdf)
Second Stage Consultation Documents
- Draft Determination (1.7 MB, pdf)
- MDFF Specification NEM12 NEM13 v2.0 Draft Determination Change Marked (692 KB, pdf)
- MDFF Specification NEM12 NEM13 v2.0 Draft Determination Clean (1.2 MB, pdf)
- MDPP v2.0 Draft Determination Change Marked (1.0 MB, pdf)
- MDPP v2.0 Draft Determination Clean (974 KB, pdf)
- Metrology Procedure Part A v7.0 Draft Determination Change Marked (1.1 MB, pdf)
- Metrology Procedure Part A v7.0 Draft Determination Clean (915 KB, pdf)
- Metrology Procedure Part B v7.0 Draft Determination Change Marked (1.4 MB, pdf)
- Metrology Procedure Part B v7.0 Draft Determination Clean (1.2 MB, pdf)
- Participant Response Template - Second Stage (119 KB, doc)
- Retail Electricity Market Procedures - Glossary and Framework v3.0 Draft Determination Change Marked (1.0 MB, pdf)
- Retail Electricity Market Procedures - Glossary and Framework v3.0 Draft Determination Clean (1.0 MB, pdf)
- COAG Energy Council Letter re: Jurisdictional metrology material changes (666 KB, pdf)
Second Stage Submissions
- AGL (294 KB, pdf)
- AusNet Service (425 KB, pdf)
- CitiPower Powercor (139 KB, pdf)
- Endeavour Energy (20 KB, pdf)
- Energy Queensland (161 KB, pdf)
- Flow Power (221 KB, pdf)
- Meridian and Powershop (204 KB, pdf)
- Momentum (859 KB, pdf)
- Origin Energy (206 KB, pdf)
- PlusES (906 KB, pdf)
- Red Energy (212 KB, pdf)
- Jemena - received 28 February 2019 (284 KB, pdf)
Final Determination Documents
- Final Report and Determination (1.3 MB, pdf)
- MDFF Specification NEM12 NEM13 v20 Final Determination Change Marked (701 KB, pdf)
- MDFF Specification NEM12 NEM13 v20 Final Determination Clean (701 KB, pdf)
- MDPP v20 Final Determination Change Marked (397 KB, pdf)
- MDPP v20 Final Determination Clean (400 KB, pdf)
- Metrology Procedure Part A v70 Final Determination Change Marked (431 KB, pdf)
- Metrology Procedure Part A v70 Final Determination Clean (412 KB, pdf)
- Metrology Procedure Part B v70 Final Determination Change Marked (866 KB, pdf)
- Metrology Procedure Part B v70 Final Determination Clean (829 KB, pdf)
- Retail Electricity Market Procedures Glossary and Framework v30 Final Determination Change Marked (579 KB, pdf)
- Retail Electricity Market Procedures Glossary and Framework v30 Final Determination Clean (579 KB, pdf)