This consultation proposes changes to the FRC Hub Operational Terms and Conditions and other technical artifacts contained in the Gas Interface Protocol and the Specification Pack.
These documentation changes are necessary as a result of the Retail Gas Hub upgrade.
Attachments
Notice of AEMO decision for IN023-14 27 February 2015 | 176 KB (.pdf) |
IIR IN023/14-Documentation Changes for the FRC Hub 9 January 2015 | 391 KB (.pdf) |
PPC IN023/14-Documentation Changes for the FRC Hub 20 November 2014 | 303 KB (.pdf) |
FRC Hub Operational Terms and Conditions – version 7.0 (Marked-up) 27 February 2015 | 661 KB (.pdf) |
Participant Build Pack 3: FRC B2B System Architecture – version 3.2 (Marked-up) 20 November 2014 | 1 MB (.pdf) |
Participant Build Pack 3: FRC B2B System Specifications – version 3.1 (Marked-up) 27 February 2015 | 1 MB (.pdf) |
Specification Pack: Usage Guide – version 5.8 (Marked-up) 20 November 2014 | 234 KB (.pdf) |
Specification Pack: FRC B2B Hub System Architecture – version 3.3 (Marked-up) 27 February 2015 | 570 KB (.pdf) |
Specification Pack: FRC B2M-B2B Hub System Specifications – version 3.7 (Marked-up) 27 February 2015 | 554 KB (.pdf) |