Notice of Consultation: Unmetered Load Guideline Final Determination

26/08/2019
Market National Electricity Market
StageFinal Report
ConvenorAEMO NEM
Initiated11/02/2014
Accepting submissions?No
Submissions close03/03/2014

The NEM load table consists of device load values or annual energy consumptions for devices that have been classified as market loads, as agreed between a Minister and AEMO, and can be used with unmetered market connection points within the NEM. These device load values are used in the algorithm that produces calculated metering data for unmetered market loads.

Under clause 14.2.4(f) of Metrology Procedure: Part B, AEMO must develop and publish a Guideline to provide industry with assistance in determining the device load or annual energy consumption of an unmetered device to support proposals to modify the NEM load table.

Matter Under Consultation.

This consultation on the Unmetered Load Guideline was undertaken to develop and publish the initial version of a Guideline to provide industry with assistance in determining the device load or annual energy consumption of an unmetered device to support proposals to modify the NEM Load Table.

This consultation was conducted under clause 14.2.4(f) of Metrology Procedure: Part B and in accordance with the National Electricity Rules (Rules) consultation requirements detailed in clause 8.9 of the Rules

The consultation has now been completed, and AEMO has published the Final Determination and Report.

Effective date of the Unmetered Load Guideline is 3 April 2014.

The following documentation is provided for this Final Determination Stage of Consultation:

    • Unmetered Load Guideline - Final Determination and Report
    • Unmetered Load Guideline – Clean version
     

Final Determination and Report

Unmetered Load Guideline Final Determination and Report
03 April 2014 | filesize: 298 KB (.pdf)
Unmetered Load Guideline v1.0 Final Determination (Clean) 
03 April 2014 | filesize: 475 KB (.pdf)

Second Stage Consultation

Unmetered Load Guideline Draft Determination and Report
14 Feb 2014 | filesize: 410 KB (.pdf)
Unmetered Load Guideline Draft Determination Change Marked
14 Feb 2014 | filesize: 563 KB (.pdf)
Unmetered Load Guideline Draft Determination Clean
14 Feb 2014 | filesize: 433 KB (.pdf)
Unmetered Load Guideline Participant Response Pack
14 Feb 2014 | filesize: 47.2 KB (.docx)

Initial Consultation Participant Responses

Unmetered Load Guideline Participant Response Pack Ausgrid Final
14 Feb 2014 | filesize: 49 KB (.pdf)
Unmetered Load Guideline Participant Response Pack ActewAGL
14 Feb 2014 | filesize: 208 KB (.pdf)
Unmetered Load Guideline Participant Response Pack Energex
14 Feb 2014 | filesize: 206 KB (.pdf)
Unmetered Load Guideline Participant Response Pack Steve Wise
14 Feb 2014 | filesize: 211 KB (.pdf)

Initial Stage Consultation

Draft Unmetered Load Guideline
26 Nov 2013 | 451 KB (.pdf)
Unmetered Load Guideline Participant Response Pack
26 Nov 2013 | 47.5 KB (.docx) 

For further information please contact David Ripper, Senior Metrology Engineer, david.ripper@aemo.com.au