AEMO published the Final Determination and MASS on 1 June 2020. The files are located in the ‘Consultation Documents’ section below. Note that the revised MASS will take effect from 1 July 2020.
AEMO wishes to thank participants for their involvement in the consultation, and for their time and effort spent in making submissions.
Causer Pays
As flagged in the consultation notice, the proposed changes to the Causer Pays procedure were contingent on the AEMC making a rule on ERC0263 “Removal of disincentives to primary frequency response”. The AEMC has deferred a draft determination on this rule to 24 September 2020. Therefore AEMO is halting further consideration of the matters flagged under this Causer Pays consultation until a later date to be advised.
The dates in this revised timetable below apply only to the MASS consultation.
Consultation timetable
Process stage |
Date |
Closing date for submissions in response to this notice of first stage of consultation |
6 December 2019 |
Publication of Draft Report and Determination |
25 February 2020 |
Closing date for submissions in response to the Draft Report and Determination** |
16 March 2020 |
Publication of Final Report and Determination |
1 June 2020 |
** Submissions provided after the closing date will be considered on a case-by-case basis.
Consultation documents
The MASS Final Determination and revised MASS are provided below. Both a clean copy and a marked up copy of the MASS are provided for convenience.
Second stage consultation documents
Documents from the first stage of consultation are provided below.
- Notice of First Stage of Consultation (203 KB, pdf)
- Proposed changes to Regulation FCAS Contribution Factors Procedure (747KB, pdf)
- MASS Issues paper - primary frequency response under normal operating conditions (370 KB, pdf)
First stage submissions
-
13/12/2019
AGL submission - MASS issues paper - PFR under normal operating conditions
81.65 KB -
13/12/2019
CS Energy to AEMO - Primary Frequency Response within NOFB 9-12-2019
543.39 KB -
13/12/2019
Delta submission - AEMO Consultation on MASS and CP
276.5 KB -
13/12/2019
EA Submission - MASS Consultation - Nov Issues Paper
68.01 KB -
13/12/2019
ERM Submission - CP and MASS Consult
261.16 KB -
13/12/2019
HydroTas - Submission to AEMO Causer Pays and MASS Consultation December 2019
834.93 KB -
13/12/2019
Infigen - PFR response under NOFB Submission
221.89 KB -
13/12/2019
MEA Powershop submission - PFR under normal operating conditions
89.08 KB -
13/12/2019
Origin - Submission to MASS Issues Paper - December 2019
72.46 KB -
13/12/2019
Stanwell response to initial consultation on MASS
99.59 KB