Reliability Standard Implementation Guidelines

18/12/2015
Market National Electricity Market
StageFinal Report
ConvenorAEMO NEM
Initiated30/10/2015
Accepting submissions?No
Submissions close18/12/2015

AEMO has completed its consultation on the Reliability Standard Implementation Guidelines (RSIG).

This consultation was conducted under NER clause 3.9.3D, which requires AEMO to develop, publish and amend from time to time RSIG that set out how AEMO will implement the reliability standard. NER clause 11.78.4(a) provides that AEMO must publish the first RSIG by 31 December 2015.

AEMO currently assesses the future performance of the power system in the context of the reliability standard in accordance with a number of processes specified in the NER. The RSIG has combined all of the processes into a single document to provide guidance on how AEMO implements the reliability standard.

Final RSIG Document:

Final Report and Determination - RSIG
18 December 2015 | filesize: 770 KB (.pdf)  

Attachments to the Final Report and Determination:

Attachment 1 - Final Reliability Standard Implementation Guidelines
18 December 2015 | filesize: 297 KB (.pdf)
Amendments to draft Reliability Standard Implementation Guidelines
18 December 2015 | filesize: 125 KB (.pdf)

RSIG Stage 1 Consultation Documents:

The documents published under RSIG Consultation 2015 Stage 1 can be found below:

Notice of first stage of consultation – Reliability Standard Implementation Guidelines
30 October 2015 | filesize: 204 KB (.pdf)
Draft Report and Determination – RSIG
30 October 2015 | filesize: 114 KB (.pdf)
Attachment 1 – Draft Reliability Standard Implementation Guidelines
30 October 2015 | filesize: 334 KB (.pdf)
RSIG Consultation 2015 Stage 1 Submission – GDF Suez
30 October 2015 | filesize: 109 KB (.pdf)