This is the 2017 consultation which is now closed, the 2022 consultation can be viewed here.
Notice of Final determination for the review of the Power System Data Communication Standard
This notice informs all Network Service Providers (Consulted Persons) that AEMO has concluded its review of the Power System Data Communication Standard.
This consultation is being conducted under clauses 4.11.2 (c) of the National Electricity Rules (NER), in accordance with the Rules consultation requirements detailed in rule 8.9 of the NER.
The consultation documents are listed below:
- Final Report and Determination – Review of Power System Data Communication Standard (369 KB, pdf)
- Power system Data Communication Standard – Effective 1st December 2017 (474 KB, pdf)
- Submission in response to second stage of the consultation – Energy Networks Australia 16 October 2017 (161 KB, pdf)
Notice of Second Stage of Consultation
National Electricity Rules – Rule 8.9
Review Of Standard For Power System Data Communication
Date Of Notice: 17 February 2017
This notice informs all Network Service Providers (Consulted Persons) that AEMO is commencing the second stage of its consultation on its review of the Power System Data Communication Standard.
This consultation is being conducted under clauses 4.11.2 (c) of the National Electricity Rules (NER), in accordance with the Rules consultation requirements detailed in rule 8.9 of the NER.
Invitation to make submissions
AEMO invites written submissions on this Draft Report.
Please identify any parts of your submission that you wish to remain confidential, and explain why. AEMO may still publish that information if it does not consider it to be confidential, but will consult with you before doing so.
Consulted Persons should note that material identified as confidential may be given less weight in the decision-making process than material that is published.
Closing Date and Time
Submissions in response to this Notice of Second Stage of Rules Consultation should be sent by email to Steven.Darnell@aemo.com.au, to reach AEMO by 19 October 2017.
All submissions must be forwarded in electronic format (both pdf and Word). Please send any queries about this consultation to the same email address.
Submissions received after the closing date and time will not be valid, and AEMO is not obliged to consider them. Any late submissions should explain the reason for lateness and the detriment to you if AEMO does not consider your submission.
Note: AEMO has extended the closing date for submissions to 19 October 2017 and publication date to 01 December 2017 . This additional time allows for AEMO further consider issued raised in this consultation.
Publication
All submissions will be published on AEMO’s website, other than confidential content.
Deliverable | Indicative date |
Draft Report & Notice of second stage consultation published | 17 February 2017 |
Submissions due on Draft Report | 19 October 2017 |
Final Determination published 01 December | 01 December 2017 |
-
21/02/2017
Draft Report and Determination Second Stage
586.08 KB -
21/02/2017
DRAFT Revised Data Communications Standard v2 - Second Stage
507.66 KB -
27/10/2016
DRAFT Revised Data Communications Standard
491.37 KB -
19/12/2016
EnergyNetworksAustralia Submission - AEMO Data Comms Std - Dec 2016
3.85 MB -
19/12/2016
Energex Submission - AEMO Data Comms Std - Dec 2016
327.69 KB