Service Level Procedure: Metering Data Provider Services Category D and C for Metering Installation Types 1, 2, 3, 4, 5, 6 and 7

26/08/2019
Market National Electricity Market
StageDraft Report
ConvenorAEMO NEM
Initiated15/04/2013
Accepting submissions?No
Submissions close29/04/2013

NEM – Notice of Final Stage Consultation

AEMO has completed consultation on Service Level Procedure: Metering Data Provider Services Category D and C for Metering Installation Types 1, 2, 3, 4, 5, 6 and 7

Scope of Consultation

This procedure has been created by combining three procedures. These procedures are:
SERVICE LEVEL PROCEDURE:
Metering Data Provider Services Category D for Metering Installation Types 1, 2, 3, and 4
SERVICE LEVEL PROCEDURE:
Metering Data Provider Services Category D for Metering Installation Types 5, 6 and 7
And
SERVICE LEVEL REQUIREMENTS:
Metering Data Collection Services for Metering Provider
Category Type 5C and 6C

These procedures have been combined to improve clarity, reduce duplication, to correct errors and omissions, to remove irrelevant text and to consolidate three documents into one master document which contains Service Level Procedures for all categories of Meter Data Provider. In addition, this document will replace the Service Level Requirements document for category C providers, completing the MDP in the Rules required changes to AEMO’s Service Level Requirements documentation.
In producing this document a mapping exercise was done to ensure that all areas of the two current Service Level Procedure documents were covered. These mapping documents form part of the consultation pack provided.
Comments from 2nd Stage consultation have been taken into consideration by AEMO and the MSWG.
The following documents have been superseded by Service Level Procedure: Metering Data Provider Services Category D and C for Metering Installation Types 1, 2, 3, 4, 5, 6 and 7 with an effective date of 12th June 2013.
SERVICE LEVEL PROCEDURE:
Metering Data Provider Services Category D for Metering Installation Types 1, 2, 3, and 4
SERVICE LEVEL PROCEDURE:
Metering Data Provider Services Category D for Metering Installation Types 5, 6 and 7
And
SERVICE LEVEL REQUIREMENTS:
Metering Data Collection Services for Metering Provider
Category Type 5C and 6C

Final Documentation

SLP_MDP_Type_1-7_Participant_comments_after_2nd_stage_MSWG_AEMO_comments
12 June 2013 | size 235kB (.pdf) 
 SLP_MDP_Type_1-7 v1.0 (change marked)
12 June 2013 | size 570kB (.pdf)
SLP_MDP_Type_1-7 v1.0 (clean)
12 June 2013 | size 471kB (.pdf)


Second Stage Consultation

SLP_MDP_Type_1-7_Participant_comments_after_1st_stage_MSWG_AEMO_comments
15 April 2013 | size 547kB (.pdf)
SLP_MDP_Type_1-7 v0 06_(change marked)
15 April 2013 | size 538kB (.pdf)
SLP_MDP_Type_1-7 v0 06 (clean)
15 April 2013 | size 429kB (.pdf)
SLP_MDP_Type_1-7_Participant_Response_Pack_Template_v1
15 April 2013 | size 120kB (.pdf)

Initial Stage Consultation

1st Stage Notice for SLP's 2013
31 Jan 2013 | size 140kB (.pdf)
SLP_MDP_Type_1-7 v0.05
31 Jan 2013 | size 471kB (.pdf)
Tracking document type 1-4 v.01
31 Jan 2013 | size 540kB (.pdf)
Tracking document type 5-7 v.01
31 Jan 2013 | size 540kB (.pdf)
SLP MDP Type 1-7 Participant Response Pack Template v1.00
31 Jan 2013 | size 121kB (.pdf)
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm