Authorised Maximum Daily Quantity (AMDQ) and AMDQ Credit Certificates (AMDQ CC) are transportation rights in the Declared Transmission System (DTS) collectively known as AMDQ. Authorised MDQ is a withdrawal right for customers and/or Market Participants on the DTS for transported gas injected at Longford.
According to National Gas Rules clauses 330 (6) and 331(1) AEMO must make procedures to set guidelines to assist the industry to manage AMDQ.
Matter Under Consultation :
This consultation is about the following changes to the Wholesale Market AMDQ Procedures;
• APA’s request for validation of firm capacity holdings and loss of firm capacity.
• Requirement for accreditation as a pre-requisite.
• A single priority queue for AMDQ transfers and AMDQ CC nominations.
• Consolidation of the current Wholesale Market AMDQ Transfer Procedures, Wholesale Market
Decision
Notice to Participants of AEMO’s Decision on making the Wholesale Market AMDQ Procedures (Victoria) 10 June 2014 | filesize: 222 KB (.pdf) |
|
Wholesale Market AMDQ Procedures (Victoria) 10 June 2014 | filesize: 808 KB (.pdf) |
|
Wholesale Market AMDQ Procedures (Victoria) Change Marked 10 June 2014 | filesize: 383 KB (.pdf) |
|
AMDQ Supporting Documentation 10 June 2014 | filesize: 1.80 MB (.pdf) |
IIR
IIR - Wholesale Market AMDQ Procedures (Victoria) 05 May 2014 | filesize: 107 KB (.pdf) |
APA Submission to IIR 10 June 2014 | filesize: 43.8 KB (.pdf) |
Lumo Energy Submission to IIR 10 June 2014 | filesize: 732 KB (.pdf) |
Attachment A -Summary of stakeholder submissions 05 May 2014 | filesize: 107 KB (.pdf) |
IIR Wholesale Market AMDQ Procedures (Victoria) – clean 05 May 2014 | filesize: 107 KB (.pdf) |
IIR Wholesale Market AMDQ Procedures (Victoria) – change marked 05 May 2014 | filesize: 107 KB (.pdf) |
Proposed Procedure Change
PPC - Wholesale Market AMDQ Procedures (Victoria) 04 March 2014 | filesize: 286 KB (.pdf) |
AGL’s submission to PPC 05 May 2014 | filesize: 107 KB (.pdf) |
Alinta Energy’s submission to PPC 05 May 2014 | filesize: 107 KB (.pdf) |
APA’s submission to PPC 05 May 2014 | filesize: 107 KB (.pdf) |
Energy Australia’s submission to PPC 05 May 2014 | filesize: 107 KB (.pdf) |
GDF SUEZ submission to PPC 05 May 2014 | filesize: 107 KB (.pdf) |
Lumo submission to PPC 05 May 2014 | filesize: 813 KB (.pdf) |
Origin Energy’s submission to PPC 05 May 2014 | filesize: 107 KB (.pdf) |
AMDQ discussion paper 04 March 2014 | filesize: 186 KB (.pdf) |
AMDQ PPC Supporting Documentation 04 March 2014 | filesize: 1.5 MB (.zip) |