SA directions between 12 and 15 Jan 2018
Intervention Settlement Timetables
Between 12 and 15 January 2018, AEMO issued directions to generators in South Australia. AEMO is required to publish two Intervention Settlement Timetables for this direction event as the event was across two Settlement Billing Weeks.
- Billing Week 2 2018 (162 KB, pdf)
- Billing Week 3 2018 (164 KB, pdf)