Directions to SA generators - 17 March 2018 to 19 March 2018
AEMO issued system strength directions to generators in South Australia from 17 March 2018 to 19 March 2018.
Where the Australian Energy Market Operator (AEMO) intervenes in the National Electricity Market (NEM) through the use of directions, AEMO must publish a report in accordance with National Electricity Rules (NER) clauses 4.8.9(f) and 3.13.6A.
The NEM Event report below satisfies those NER obligations and is based on information available to AEMO at the time of publication: