List of Standard CST Measurements and Faults

Measurements 

The following is a list of standard measurements that will be available for reference for any prospective users of the Connections Simulation Tool.

State

Location

Measurement Type

SA

Croydon 66

FVP

VIC

Dederang 330

FVP

VIC

Hazelwood 500

FVP

VIC-SA

Heywood - SouthEast

PQV

VIC

Heywood 275

FVP

VIC

Moorabool 220

FVP

NSW

Bannaby 500

FVP

NSW

Canberra 132

FVP

VIC-NSW

Murray - Lower Tumut 330

PQV

NSW

Coffs Harbour 132

FVP

VIC-NSW

Murray - Upper Tumut 330

PQV

SA

Davenport 275

FVP

VIC-SA

Murraylink VIC

PQV

SA

Magill 66

FVP

SA

Mobilong 132

FVP

NSW

Cowra 132

FVP

SA

Murraylink SA

PQV

SA

Para 275

FVP

SA

Robertstown 275

FVP

SA

Snuggery 132

FVP

SA-VIC

SouthEast - Heywood

PQV

NSW

Dapto 330

FVP

NSW

Darlington Point 330

FVP

NSW

Kemp Creek 500

FVP

VIC-NSW

Red Cliffs - Buronga 220

PQV

VIC

Red Cliffs 220

FVP

NSW

Newcastle 330

FVP

NSW

Orange 132

FVP

QLD

Belmont 110

FVP

VIC

Thomastown 220

FVP

QLD-NSW

QNI

PQV

NSW

Sydney East 132

FVP

NSW

Sydney North 132

FVP

NSW

Sydney South 132

FVP

NSW

Sydney West 132

FVP

NSW

Tamworth 330

FVP

NSW

Tomago 330

FVP

VIC-NSW

Wodonga - Jindera 330

PQV

NSW

Wellington 330

FVP

QLD

Bouldercombe 275

FVP

QLD

Bulli Creek 330

FVP

QLD

Calvale 132

FVP

QLD

Chalumbin Bus 275

FVP

QLD

Gin Gin 275

FVP

QLD

Greenbank 275

FVP

QLD

Lilyvale 132

FVP

NSW

Yass 330

FVP

QLD

Townsville South 132

FVP

QLD

Western Downs 275

FVP

QLD

Woree Bus 132

FVP

Faults 

The table below lists the locations of disturbances that are already pre-configured in the Connections Simulation Tool. 

You are able to trigger a disturbance with at these locations with the following options:

Fault Time: 

You may apply a fault at any time during the simulation (the default duration for a simulation is 30s), but they should be applied AFTER the PSCAD model initialization period (i.e., after 15s).

Fault Duration: 

You can select how long the disturbance will be applied for

Fault Type :

For example, you can select to apply a disturbance at Ballarat - Waubra - Ararat 220kV Tee Line (Fault ID 32040), and then subsequently you can select any desired fault type to apply (e.g., AG, ABG, ABC, BCG, etc.).

Clearance Options: 

You can choose between primary or secondary clearance.

For any disturbance not listed in the table, you must request it within your case submission, where the Connections Simulation Tool team will assess any such requests and add it to your case if it is reasonable to do so.

Fault ID

Fault Description

20021

 Eraring Unit 1 Transformer 330kV Side Terminal

20103

 Bayswater Unit 3 Transformer 500kV Side Terminal

20411

 Liddell Unit 1 Transformer 330kV Side Terminal

20511

 Mt Piper Unit 1 Transformer 330kV Side Terminal

20855

 Vales Point Unit 1 Transformer 330kV Side Terminal

21077

 Armidale - Dumaresq 330kV Line 1 (Feeder 8C)

21200

 Darlington Pt - Wagga 330kV Line (Feeder 63)

22201

 Darlington Pt - Balranald 220kV Line (Feeder X5/1)

23082

 Buronga - Red Cliffs 220kV Line (Feeder OX1)

30441

 Loy Yang A Unit 1 Transformer HV Side Terminal

32040

 Ballarat - Waubra - Ararat 220kV Tee Line

32080

 Ballarat - Bendigo 220kV Line

32081

 Kerang - Bendigo 220kV line

32280

 Horsham - Murra Warra - Kiamal 220kV Tee Line

32730

 Crowlands - Bulgana - Horsham 220kV Tee Line

32831

 Kerang - Wemen - Red Cliffes 220kV Tee Line

35480

 Moorabool - Sydenham 500kV Line 1

35488

 Moorabool - Haunted Gulley 500kV Line

42521

 Kogan Creek Transformer HV Side Terminal

44071

 Gladstone Unit 1 Transformer HV Side Terminal

44271

 Tarong Unit 1 Transformer HV Side Terminal

44301

 Callide B Unit 1 Transformer HV Side Terminal

44503

 Callide C Unit 1 Transformer HV Side Terminal

44711

 Barron Gorge Unit 1 Transformer 132kV Side Terminal

44761

 Kareeya Unit 1 & 3 Transformer 132kV Side Terminal

45396

 Woree SVC POC

46111

 Nebo SVC POC

46131

 Ross SVC POC

46331

 Stanwell Unit 1 Transformer HV Side Terminal

46359

 Strathmore SVC POC

49032

 Bulli Creek - Dumaresq 330kV Line 1 (QNI) (Feeder 8L)

49055

 Millmerran Unit 1 Transformer HV Side Terminal

50371

 Pelican Point Gas Turbine 1 Transformer HV Side Terminal

50378

 Quarantine Unit 5 Transformer HV Side Terminal

50381

 Torrens Island A Unit 1 Transformer HV Side Terminal

50385

 Torrens Island B Unit 1 Transformer HV Side Terminal

50391

 Osborne Gas Turbine Transformer HV Side Terminal

53113

 Olympic Dam West - Davenport 275kV Line

53900

 Heywood - South East 275kV Line 1

334081

 Trip Horsham SVC

342081

 Trip Kerang SVC

356090

 Dedarang - South Murray Line 2

X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm