Summer operations 2017-18
Read AEMO's full pre-summer 2017-18 report here:
- AEMO's Summer operations 2017-18 report 28 November 2017 (1.4 MB, pdf)
Read AEMO’s full post-summer 2017-18 review report here, with two annexures about NEM events during summer on 30 November 2017 (in Victoria) and 19 January 2018 (in Victoria and South Australia):
- AEMO’s Summer 2017-18 operations review report (1.3 MB, pdf)
- Annexure A – 30 November 2017 (0.8 MB, pdf)
- Annexure B – 19 January 2018 (0.8 MB, pdf)
- RERT 2017-18 cost update (203 KB, pdf)