RCM Constraints Library
RCM Constraint Equations
AEMO is required to publish Network Access Quantity (NAQ) Model Inputs under clause 4.15.16(a) of the WEM Rules. The archives below contain RCM Constraint Equations used in the NAQ Model and the RCM Limit Advice used to create those constraints. Each archive contains the data in both JSON and CSV formats, note that both formats contain the same data.
RCM Limit Advice
Under clause 4.4B.6 AEMO must publish by 19 June in Year 1 of the Reserve Capacity Cycle the RCM Limit Advice received from the Network Operator. This initial version of the RCM Limit Advice is typically not the version that gets used to create the RCM Constraint Equations used in the NAQ Model. To satisfy this rule obligation all versions of the RCM Limit Advice are published below.