Procedures and guides
The following Procedures and Guides govern the operation of the Gas Bulletin Board. The East Coast Gas System (ECGS) Procedures operate in conjunction with the Gas Bulletin Board and can be found here.
Procedures
This document applies from 3 March 2025:
This document applies before 3 March 2025:
Technical Documents
These documents apply from 3 March 2025:
These documents apply before 3 March 2025:
Guides
-
30/08/2024
Gas Field Interest Template
This spreadsheet can be used as a simplified submission template for providing field interest information and reserves and resources estimates
28.21 KB -
11/02/2021
BB Pipeline Flow and Capacity Business Rules
This report contains the business rules for determining the BB Pipeline Flow and Capacities as displayed on the map
244.95 KB -
08/03/2019
Reporting of Iona Storage Volumes for Casino
Details how Casino-Henry gas field production can be derived from Iona Gas Storage volumes (historical – processing is now undertaken at the Athena Gas Plant)
183.34 KB -
26/09/2018
Old to new connection point mapping spreadsheet
This spreadsheet maps old GBB connection points to their new format
154.21 KB -
26/09/2018
BB Reports Mapping Reference Guide
Gas Bulletin Board - Mapping Reference Guide
485.01 KB