Frequency Performance Payments procedure simulation results
AEMO simulated the Frequency Performance Payments (FPP) procedure for a historical period of time in 2021, according to the latest version of the draft procedure.
From the simulation results, below are the Usage, Requirement for Corrective Response, Performance, and Frequency Measure data for Mainland requirements.
-
17/03/2023
Frequency Measure for Mainland on 1/08/2021 (“FM_Mainland_1AUG.csv”)
314.43 KB -
17/03/2023
Raise Requirement for Corrective Response (RCR) for Mainland requirements on 1/08/2021 (“Raise_RCR_FMAIN_1AUG.csv”)
14.4 KB -
17/03/2023
Lower Requirement for Corrective Response (RCR) for Mainland requirements on 1/08/2021 (“Lower_RCR_FMAIN_1AUG.csv”)
14.5 KB -
17/03/2023
Raise Usage for Mainland requirements on 1/08/2021 (“Raise_Usage_FMAIN_1AUG.csv”)
13.41 KB -
17/03/2023
Lower Usage for Mainland requirements on 1/08/2021 (“Lower_Usage_FMAIN_1AUG.csv”)
10.29 KB -
17/03/2023
Raise Performance of all eligible units with appropriate metering in Mainland on 1/08/2021 (“RaisePerf_1AUG.csv”)
538.45 KB -
17/03/2023
Lower Performance of all eligible units with appropriate metering in Mainland on 1/08/2021 (“LowerPerf_1AUG.csv”)
558.04 KB