Power of Choice - Procedures
The POC Procedures work stream was a working group under the (now concluded) Power of Choice program. It was responsible for developing changes to AEMO Procedures in relation to the following NER final determinations:
- Competition in Metering and Related Services
- Embedded Networks
- Meter Replacement Processes
During the development of these procedure changes, AEMO conducted a series of industry consultations in accordance with the NER consultation procedures. You can find a summary of these consultations below.
NER Consultation - POC Procedure Changes (Package 1)
This consultation concluded on 31 August 2016. Click here for a link to the consultation page and copies of all the materials contained in the consultation pack for Package 1.
NER Consultation - POC Procedure Changes (Package 2)
This consultation concluded on 28 February 2017. Click here for a link to the consultation page and copies of all the materials contained in the consultation pack for Package 2.
NER Consultation - POC Procedure Changes (Package 3)
This consultation commenced on 12 May 2017. Click here for a link to the consultation page and copies of all the materials contained in the consultation pack for Package 3.