Work package 5: Market and system operations

Overview

The market and system operations procedures, methodologies and guidelines that are affected by the Wholesale Demand Response Mechanism (WDRM) rule are placed into the following three groups:

  • Group 1: Documents subject to Rules consultation - Updated under a Rules consultation
    Documents in this group have been updated under a Rules consultation.
  • Group 2: Documents subject to Rules consultation - Update for minor and administrative changes
    Documents in this group will be updated without a Rules consultation because the necessary WDR changes are considered minor or administrative in nature.
  • Group 3: Other Documents
    Documents in this group are not subject to Rules consultation.

Group 1 documents - updated under a Rules consultation

(Updated documents are available at the consultation page)

  • Intervention Pricing Methodology 
  • Constraint Formulation Guidelines
  • Market Suspension Compensation Methodology
  • Procedure for Issue of Directions and Clause 4.8.9 Instructions

Consultation Key dates

Issues paper published 9 October 2020
 Submissions due on Issues Paper 17 November 2020
Draft Report published 11 December 2020
 Submissions due on Draft Report 29 January 2021
Final Report published 12 March 2021

Group 2 documents – minor and administrative changes:

  • Spot Market Operations Timetable
  • Power System Security Guidelines (SO_OP_3715)

Group 3 – Other documents:

(Documents in this group will be added to the list as they are updated.)