Consultation timeline
-
FRG meeting26 Oct 2022
-
Consultation paper published31 Oct 2022
-
Workshops – Collaborate on consultation topics7-8 Nov 2022
-
Stage 1 consultation submissions close28 Nov 2022
-
Draft determination and draft reports published3 Feb 2023
-
Stage 2 consultation submissions close3 Mar 2023
-
Final determination and final reports published24 Apr 2023
Key contact
Overview
This consultation will review numerous reliability forecasting guidelines and methodologies. In undertaking this consultation AEMO applies both the standard rules consultation procedure as described in clause 8.9.2 of the National Electricity Rules (NER) and the Forecasting Best Practice consultation procedures as described in the Appendix A of the AER’s Forecasting Best Practice Guidelines.
This consultation aims to meet AEMO’s requirements under:
- the Enhancing information on generator availability in MTPASA rule change
- AEMO’s commitment to review processes used for projecting supply adequacy over the medium term, as specified in the market event and reviewable operating incident report for the NEM market suspension and operational challenges in June 2022.
- the AER’s Forecasting Best Practise Guidelines (to review at least once every four years)
- AEMO’s Reliability Forecast Guidelines (to review at least once every four years)
- NER 3.9.3D(e) (to review the Reliability Standard Implementation Guidelines at least once every four years)
AEMO will also implement minor and administrative changes related to the Integrating Energy Storage Systems in the NEM rule change.
-
First Stage
-
Second Stage
-
Final Report and Guidelines
Please note the Final consultation paper and guidelines and methodologies are now available. The First Stage materials include:
-
31/10/2022
NEM Reliability Forecasting Guidelines and Methodology Consultation paper
585.96 KB -
17/12/2020
Reliability Standard Implementation Guidelines
494.52 KB -
07/09/2020
EAAP Guidelines
661.61 KB -
13/07/2021
Generation Information Guidelines
368.44 KB -
01/12/2021
MT PASA Process Description
1.49 MB -
31/08/2022
ESOO and Reliability Forecast Methodology Document
888.45 KB
Workshops
AEMO held workshops to collaborate on specific consultation topics.
Draft Report and Guidelines
-
03/02/2023
Draft Report
510.26 KB -
03/02/2023
Reliability Standard Implementation Guidelines Clean
476.11 KB -
03/02/2023
EAAP Guidelines Clean
300.39 KB -
03/02/2023
Generation Information Guidelines Clean
947.8 KB -
03/02/2023
MT PASA Process Description Clean
1.8 MB -
03/02/2023
ESOO & Reliability Forecast Methodology Clean
1.01 MB -
03/02/2023
Reliability Standard Implementation Guidelines Track Changes
504.79 KB -
03/02/2023
EAAP Guidelines Track Changes
596.07 KB -
03/02/2023
Generation Information Guidelines Track Changes
376.05 KB -
03/02/2023
MT PASA Process Description Track Changes
1.8 MB -
03/02/2023
ESOO & Reliability Forecast Methodology Track Changes
1.12 MB -
03/02/2023
DRAFT GELF Template (excel file)
209.59 KB
Workshop
This workshop discussed topics raised in first stage consultation submissions and the draft determination.
-
24/04/2023
Reliability Forecasting guidelines and methodologies final report
508.68 KB -
24/04/2023
Reliability Standard Implementation Guidelines
390.42 KB -
24/04/2023
EAAP Guidelines
270.95 KB -
24/04/2023
Generation Information Guidelines
312.35 KB -
24/04/2023
MT PASA Process Description
1.63 MB -
24/04/2023
ESOO and Reliability Forecast Methodology Document
923.26 KB -
03/06/2024
Spot Market Operations Timetable
289 KB -
24/04/2023
Reliability Standard Implementation Guidelines Tracked Changes
415.79 KB -
24/04/2023
EAAP Guidelines Tracked Changes
525.64 KB -
24/04/2023
Generation Information Guidelines Tracked Change
324.1 KB -
24/04/2023
MT PASA Process Description Tracked Changes
1.64 MB -
24/04/2023
ESOO and Reliability Forecast Methodology Document Tracked Changes
1 MB -
24/04/2023
Spot Market Operations Timetable Tracked Changes
391.57 KB