AEMO is conducting a consultation on B2B Procedures on behalf of the Information Exchange Committee (IEC).
The Consultation is being conducted under clause 7.17.4 of the National Electricity Rules (NER), in accordance with the Rules consultation requirements in NER 8.9.
Matter under consultation
The changes (Changes) which are proposed (Proposal) support:
- The implementation of:
- The Accelerating Smart Meter Deployment (ASMD) Rule of the Australian Energy Market Commission (AEMC).
- The following Issues and Change Forms (ICFs):
- B002/22 - Alignment of B2B field lengths to B2M Procedures/schema.
- B004/22 - Alignment of B2B field lengths to the Australian Standards.
- B006/22 - PERSONNAME definition spec correction.
- B007/22 - Discrepancy between B2B SO Process and B2B Guide.
- B011/23 - Amending the definition of Unknown Load ExceptionCode.
- B014/23 - Define obligations for managing inflight service orders sent to metering service providers when a ROLR event is declared.
The following procedures are being proposing to be amended under this consultation.
Instrument |
New/Amended |
Customer Site Details Notification Process |
Amended (Procedure changes) |
Service Order Process |
Amended (Procedure changes) |
Meter Data Process |
Amended (Version control only) |
One Way Notification Process |
Amended (Procedure changes) |
Technical Delivery Specification |
Amended (Procedure changes) |
NEM RoLR Processes Part A and Part B |
Amended (Procedure changes) |
The IEC invites comments on the proposed changes contained within the Notice of Consultation. Submissions should be forwarded to NEM.Retailprocedureconsultations@aemo.com.au by 5:00pm (Melbourne time) on Thursday, 11 July 2024.
Submissions must be made using the response template linked below.
Any queries should be directed to AEMO's NEM Retail Procedures Consultation email address, NEM.Retailprocedureconsultations@aemo.com.au
First stage submissions
-
22/07/2024
First Stage Consolidated Responses
750.57 KB -
22/07/2024
AGL
322.64 KB -
22/07/2024
Alinta Energy
250 KB -
22/07/2024
Ausgrid
171.59 KB -
22/07/2024
Bluecurrent
415.9 KB -
22/07/2024
CitiPower Powercor
335.2 KB -
22/07/2024
Endeavour Energy
169.15 KB -
22/07/2024
Energy Australia
170.67 KB -
22/07/2024
Energy Queensland
229.62 KB -
22/07/2024
Evoenergy
168.75 KB -
22/07/2024
Intellihub
886.92 KB -
22/07/2024
Origin Energy
320.54 KB -
22/07/2024
PLUS ES
275.13 KB -
22/07/2024
Red Lumo
125.43 KB -
22/07/2024
SA Power Networks
175.08 KB -
22/07/2024
TasNetworks
184.75 KB -
22/07/2024
United Energy
334.9 KB
First stage consultation documents
-
12/08/2024
B2B v3.9 consultation Time Limit Extension
102.17 KB -
29/05/2024
B2B Procedures v3.9 Issues Paper
1.36 MB -
29/05/2024
Participant response template
28.62 KB -
29/05/2024
B2B Procedure Customer and Site Details Notification Process v3.9
452.14 KB -
29/05/2024
B2B Procedure Service Order Process v3.9
1.16 MB -
29/05/2024
B2B Procedure Meter Data Process v3.9
465.54 KB -
29/05/2024
B2B Procedure One Way Notification Process v3.9
495.34 KB -
29/05/2024
B2B Procedure Technical Delivery Specification Process v3.9
1.24 MB -
29/05/2024
NEM RoLR Processes Part A and Part v2.5
1.07 MB