Draft 2024 General Power System Risk Review report consultation

30/05/2024
Market National Electricity Market
StageFinal Report
ConvenorAEMO NEM
Initiated30/05/2024
Accepting submissions?No

Timeline

  • Draft 2024 GPSRR report published
    30 May 2024
  • Q&A Session
    7 June 2024
  • Submissions close
    14 June 2024
  • Final 2024 GPSRR report published
    By 25 July 2024

Key contact

A mail icon. Email: gpsrr@aemo.com.au

In accordance with rule 5.20A of the National Electricity Rules (NER), AEMO is required to undertake a General Power System Risk Review (GPSRR) and prepare a GPSRR report for the National Electricity Market (NEM) at least annually. From 2023, the GPSRR replaces and expands on the scope of the previous biennial Power System Frequency Risk Review (PSFRR).

AEMO has now completed the 2024 GSPRR draft report consultation. The final 2024 GPSRR report was published on 25 July 2024.

AEMO held an industry question and answer session on the draft 2024 GPSRR report on 7 June 2024 for all Registered Participants and interested parties. A summary of the feedback received is summarised in Appendix 6 of the final report.

GPSRR Webpage

Submissions on the draft 2024 GPSRR report closed on 14 June 2024.