General Power System Risk Review

In accordance with rule 5.20A of the National Electricity Rules (NER), AEMO is required to undertake a General Power System Risk Review (GPSRR) and prepare a GPSRR report for the National Electricity Market (NEM) at least annually. From 2023, the GPSRR replaces and expands on the scope of the previous Power System Frequency Risk Review (PSFRR).

View previous PSFRRs

The GPSRR is an integrated, annual review of major power system risks in the National Electricity Market (NEM). The purpose of the GPSRR is to review:

  • A prioritised set of risks comprising contingency events and other events and conditions that could lead to cascading outages or major supply disruptions.
  • The current arrangements for managing the identified priority risks and options for their future management.
  • The arrangements for management of existing protected events and consideration of any changes or revocation.
  • The performance of existing emergency frequency control schemes and the need for any modifications.

Current status

AEMO is currently working on the 2025 GPSRR. Consultation on the Approach Paper is open between 4 October and 5 November 2024.

Consultation on the 2025 GPSRR approach 

Following consultation on the approach, AEMO plans to publish a draft GPSRR, with the final GPSRR report due by 31 July 2024.

AEMO is holding an industry question and answer session on the draft 2025 GPSRR approach on 24 October 2024 for all Registered Participants and interested parties.

For any enquiries, please contact AEMO at: gpsrr@aemo.com.au

Previous GPSRRs

X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm