Australian Energy Market Operator (AEMO) has concluded a consultation on the proposed amendments to the Market Settlement and Transfer Solutions (MSATS) procedures in response to the Australian Energy Market Commission's (AEMC's) final determination for the Reducing Customer Switching rule change.
This consultation was conducted in accordance with the Rules consultation requirements detailed in clause 8.9 of the National Electricity Rules (NER).
AEMO conducted a minor amendment process on the Market Settlement and Transfer Solution (MSATS) Procedures Consumer Administration and Transfer Solution (CATS) Procedure Principles and Obligations version Customer Switching.
This consultation was in accordance with the Rules requirements detailed in clause 7.16.7 of the NER.
Background
On 3rd December 2018, the AEMC in conjunction with AEMO provided joint advice (477 KB, pdf) to the COAG Energy Council Standing Committee of Officials regarding the implementation options for recommendations 8 and 9 of the Australian Competition and Consumer Commission’s (ACCC’s) Retail Electricity Pricing final report (9.21 MB, pdf).
The AEMC and AEMO advice proposed a number of actions to improve the existing customer transfer process. These proposed actions were broader than the recommendations proposed by the ACCC. The proposed actions included the provision by AEMO of a High-Level Design (HLD), and associated rule changes, for a customer transfer process that streamlines existing procedures and improves customer outcomes and competition in the National Electricity Market (NEM) retail market.
On 24 May 2019, the AEMO submitted a rule change request (1.1 MB, pdf) (including the proposed HLD) to the AEMC to amend the NER and the National Energy Retail Rules (NERR). The rule change and proposed HLD has been submitted to the AEMC to support the delivery of reducing customer transfer times, by making procedural changes to improve customer transfer processes.
On 4 July 2019, the AEMC commenced the Reducing Customer Switching consultation on AEMO’s rule change request.
NEM Customer Switching: Q&A Session
Across August and September 2021, AEMO is holding Q&A sessions to walk through the AEMO’s Customer Switching changes.
-
16/08/2021
Presentation
473.01 KB -
16/08/2021
Session notes
343.47 KB -
31/08/2021
Presentation
483.84 KB -
31/08/2021
Session notes
286.37 KB -
31/08/2021
Sample CR1060 REQ notification
1.78 KB -
31/08/2021
Sample CR1060 COM notification
10.55 KB -
14/09/2021
Presentation
461.32 KB -
14/09/2021
Sample RM29 Report for inflight transfer CRs
90.87 KB -
14/09/2021
Handling of changes to Substituted Reads for transfers for Basic Meters
187.67 KB -
14/09/2021
Session notes
203.22 KB -
28/09/2021
Presentation
534.84 KB
Next sessions: 28 September 2021.
NEM Customer Switching: Technical Specification Q&A Session
On 16 November 2020, AEMO held a Q&A session to walk through the Draft Technical Specification for AEMO’s Customer Switching changes.
NEM Customer Switching: Technical Information Session
On 28 August 2020, AEMO held an information session to walk through the Technical Requirements as well as Previous Read Date and Quality Flag methodology as part of the AEMO’s Customer Switching changes.
-
-
03/03/2021
MSATS 46.99 Technical Specification v1.00 marked up
1.7 MB -
13/10/2020
Presentation - corrected v2
504.92 KB -
13/10/2020
Example: NMI Discovery - PRD Success
10.43 KB -
13/10/2020
Example: NMI Discovery - PRD Error
13.92 KB -
13/10/2020
Scenarios: Basic PRD
49.9 KB -
13/10/2020
Scenarios: Interval PRD
42.51 KB
Indicative* Consultation Timeline
Process |
Indicative Date |
Status |
Pre-Consultation Workshop |
21 August 2019 | Completed |
First Stage: |
||
Initial Draft Procedures, Issues Paper and Notice of Consultation |
17 October 2019 |
Completed |
Submissions close** |
22 November 2019 |
Closed |
Second Stage: |
||
Draft Report and Notice of Consultation(indicative) |
20 December 2019 |
Completed |
Submissions close** |
29 January 2020 |
Closed |
Final Report and Determination |
31 March 2020 |
Completed |
Minor Amendment Change Paper |
28 May 2020 |
Completed |
Submissions close** |
12 June 2020 |
Closed |
Final Minor Amendment Report |
3 July 2020 |
Completed |
** Submissions provided after the closing date will be considered on a case-by-case basis.
Please reach out to NEM.Retailprocedureconsultations@aemo.com.au if you have any questions.
NEM Customer Switching: Publication of Documents with Effective Date, Version Numbers and Version Release Histories
AEMO has published the following documents with the effective date of 1 October 2021, as well as with their final version numbers and version release histories, respectively:
-
09/09/2020
MSATS Procedures - CATS v4.9 (Final - change marked)
Effective date 1 October 2021
3.14 MB -
09/09/2020
MSATS Procedures - CATS v4.9 (Final - clean)
Effective date 1 October 2021
3.45 MB -
09/09/2020
MSATS Procedures - WIGS v4.9 (Final - change marked)
Effective date 1 October 2021
2.18 MB -
09/09/2020
MSATS Procedures - WIGS v4.9 (Final - clean)
Effective date 1 October 2021
2.16 MB -
09/09/2020
Meter Data File Format (MDFF) Specification NEM12 & NEM13 (Final - change marked)
Effective date 1 October 2021
1.04 MB -
09/09/2020
Meter Data File Format (MDFF) Specification NEM12 & NEM13 (Final - clean)
Effective date 1 October 2021
1.04 MB -
09/09/2020
Retail Electricity Market Procedures – Glossary and Framework (Final - change marked)
Effective date 1 October 2021
837.95 KB -
09/09/2020
Retail Electricity Market Procedures – Glossary and Framework (Final - clean)
Effective date 1 October 2021
836.67 KB
Minor amendment submissions
Minor amendment process documents
AEMO invites comments on the proposed changes contained within the Notice of Minor Amendment Process. Submissions should be forwarded to AEMO by 5:00pm (Melbourne time) on Friday 12 June 2020.
Final Report
-
31/03/2020
NEM Customer Switching Final Report and Determination
1.05 MB -
31/03/2020
MDFF Specification NEM12 NEM13 CS (Final Determination - Change Marked)
760.05 KB -
31/03/2020
MDFF Specification NEM12 NEM13 CS (Final Determination - Clean)
834.43 KB -
31/03/2020
MSATS Procedures CATS CS (Final Determination Consultation - Change Marked Final Only)
3.44 MB -
31/03/2020
MSATS Procedures CATS CS (Final Determination Consultation - Clean)
2.85 MB -
31/03/2020
MSATS Procedures WIGS CS (Final Determination Consultation - Change Marked Final Only)
1.99 MB -
31/03/2020
MSATS Procedures WIGS CS (Final Determination Consultation - Clean)
1.78 MB -
31/03/2020
Retail Electricity Market Procedures - Glossary and Framework CS (Change Marked Final Only)
764.04 KB -
31/03/2020
Retail Electricity Market Procedures - Glossary and Framework CS (Final Determination Clean)
605.07 KB
Extension of time for final determination and procedures for Customer Switching in the NEM
Final Determination and Procedures to be published on 31 March 2020.
AEMO is extending the date for publication of the final determination and procedures for Customer Switching in the NEM from 11 March 2020 to 31 March 2020. The extension is required for AEMO to further consider and evaluate the impact of the proposed system changes to implement the final determination and procedures for Customer Switching in the NEM, on or around the same time as the implementation of system changes required for the Five-Minute Settlement Rule Change. AEMO recognises that effective development and deployment of system changes for both the five-minute settlement and customer switching projects is critical for their successful implementation and adoption.
AEMO received feedback through submissions and in meetings with interested parties which referred to the importance of implementation timing, including:
- Qualified support for proposed implementation timing in the Draft Report, providing that synergies with the five-minute settlement project can be realised, as proposed by AEMO; and
- Concerns regarding the capacity and risks of implementing customer switching system changes on or around the same time as implementation of the five-minute settlement system changes.
For information contact: NEM.Retailprocedureconsultations@aemo.com.au.
Second stage submissions
-
10/02/2020
AGL
131.07 KB -
10/02/2020
Ausgrid
266.3 KB -
10/02/2020
AusNet Services
287.18 KB -
10/02/2020
CitiPower Powercor
116.18 KB -
10/02/2020
Endeavour Energy
36.88 KB -
25/02/2020
Energy Queensland
336.83 KB -
10/02/2020
EnergyAustralia
94.62 KB -
10/02/2020
ERM Power
272.84 KB -
10/02/2020
Evoenergy
238.58 KB -
10/02/2020
Intellihub
205.26 KB -
10/02/2020
MEA Powershop
97.91 KB -
10/02/2020
Momentum
449.99 KB -
10/02/2020
Origin Energy
310.11 KB -
10/02/2020
Public Interest Advocacy Centre
89.81 KB -
10/02/2020
PLUS ES
76.1 KB -
10/02/2020
Red Energy and Lumo Energy
293.71 KB -
10/02/2020
SA Power Networks
314.75 KB -
10/02/2020
Tango Energy
328.72 KB -
10/02/2020
TasNetworks
1.23 MB -
10/02/2020
United Energy
116.46 KB
Second stage consultation documents
- NEM Customer Switching Draft Determination (2.1 MB, pdf)
- Participant Response Template (93 KB, docx)
- MSATS Procedures – CATS v4.9 Draft Determination Change Marked (4.0 MB, pdf)
- MSATS Procedures – CATS v4.9 Draft Determination Clean (2.7 MB, pdf)
- MSATS Procedures – WIGS v4.9 Draft Determination Change Marked (1.9 MB, pdf)
- MSATS Procedures – WIGS v4.9 Draft Determination Clean (1.7 MB, pdf)
- MDFF Specification NEM12 NEM13 v1.07 Draft Determination Change Marked (937 KB, pdf)
- MDFF Specification NEM12 NEM13 v1.07 Draft Determination Clean (827 KB, pdf)
- Glossary and Framework v2.3 Draft Determination Change Marked (641 KB, pdf)
- Glossary and Framework v2.3 Draft Determination Clean (675 KB, pdf)
First Stage Submissions
- ACT Civil and Administrative Tribunal (187 KB, pdf)
- AGL Energy (144 KB, pdf)
- Ausgrid (241 KB, pdf)
- AusNet Services (303 KB, pdf)
- Australian Energy Council (585 KB, pdf)
- CitiPower Powercor (120 KB, pdf)
- Endeavour Energy (65 KB, pdf)
- Energy Australia (287 KB, pdf)
- Energy Consumers Australia (135 KB, pdf)
- Energy Queensland (358 KB, pdf)
- ERM Power (219 KB, pdf)
- Evoenergy (745 KB, pdf)
- IntelliHUB Group (235 KB, pdf)
- MEA Powershop (126 KB, pdf)
- Momentum Energy (381 KB, pdf)
- Origin Energy (392 KB, pdf)
- PLUS ES (316 KB, pdf)
- Powermetric (259 KB, pdf)
- Public Interest Advocacy Centre (121 KB, pdf)
- Red Energy / Lumo Energy (255 KB, pdf)
- SA Power Networks (259 KB, pdf)
- Simply Energy (329 KB, pdf)
- Tango Energy (472 KB, pdf)
- TasNetworks (1.3 MB, pdf)
- United Energy (120 KB, pdf)
- Vector Metering (255 KB, pdf)
First Stage Consultation Documents
AEMO invites comments on the proposed changes contained within the Notice of First Stage of Consultation and Issues Paper.
Submissions should be forwarded to AEMO by 5:00pm (Melbourne time) on Friday 22 November 2019.
- Notice of First Stage Consultation (99.4 KB, pdf)
- NEM Customer Switching Issues Paper (526 KB, pdf)
- Participant Response Template – First Stage (95.5 KB, doc)
Note: To help stakeholders and other interested parties respond to this Issues Paper, AEMO has published a track changed version of MSATS CATS and MDFF procedures. The CATS Procedure and MDFF Specification reflect potential solutions that AEMO particularly has in mind, from among the various options on which AEMO is consulting with an open mind, as articulated in the Issues Paper.
- MSATS Procedures – CATS v4.9 Initial Draft change marked (3.8 MB, pdf)
- MSATS Procedures – CATS v4.9 Initial Draft clean (2.9 MB, pdf)
- MDFF Specification NEM12 NEM13 v1.07 Initial Draft change marked (934 KB, pdf)
- MDFF Specification NEM12 NEM13 v1.07 Initial Draft clean (826 KB, pdf)