System restart ancillary services guideline
SRAS Guideline
AEMO makes the ‘SRAS Guideline’ under clause 3.11.7 of the National Electricity Rules (NER). The SRAS Guideline also incorporates AEMO’s determination of electrical sub-network boundaries under NER clause 3.11.8.
The SRAS Guideline describes principles and processes designed to ensure AEMO procures SRAS that meet the system restart standard (set by the Reliability Panel) at the lowest long-term cost. The Guideline includes technical, modelling, assessment and testing requirements for SRAS, a process for assessing individual and aggregate reliability of SRAS, and applicable procurement processes.
The Guideline includes requirements applicable to SRAS providers, network service providers, and registered participants who need to participate in a system restart test.
Registered participants and prospective participants interested in being assessed for future provision of SRAS should contact AEMO at SRAS.procurement@aemo.com.au.
The current SRAS Guideline and associated information can be accessed below:
-
08/02/2021
SRAS Guideline 2021
1.55 MB -
03/05/2023
Power System Design and Setting Data Sheets v1.2
Power system modelling data required for SRAS
190 KB -
13/01/2021
SRAS modelling data refresher session presentation
For potential SRAS providers
1.88 MB -
13/01/2021
SRAS modelling data refresher session recording
76.31 MB
Previous versions of the SRAS Guideline can be accessed below.