Expressions of Interest and Indicative Facility Class assessment
AEMO invites both existing and new Market Participants to provide information regarding new Energy Producing System and/or Demand Side Management (DSM) capacity they intend to make available as Reserve Capacity in the South West Interconnected System (SWIS).
2024 Expressions of Interest
The 2024 Request for Expressions of Interest (REOI) invites Market Participants and proponents to submit an Expression of Interest (EOI) for Certified Reserve Capacity in the 2026-27 Capacity Year.
Proponents are not required to submit an Expression of Interest (EOI) to be eligible to apply for Certified Reserve Capacity (CRC).
For proponents that submit an EOI, AEMO will assess the EOI and assign an indicative Facility Class (IFC) for CRC application purposes prior to the opening of the CRC window.
The submission of a valid EOI and the submission time will affect the Facility’s priority order when assigning the Network Access Quantity (NAQ) in instances where there is a tie-break in the NAQ calculation process.
Proponents that do not submit an EOI must apply for an IFC assessment prior to applying for CRC. IFC assessment submissions require the same information submitted in an EOI. IFC are submitted using the same application form as the EOI application form. All questions in the EOI/IFC assessment must be responded to and supporting evidence should be submitted where appropriate.
Failure to adequately respond to the EOI may result in the EOI being deemed invalid under clause 4.2.6 of the Wholesale Electricity Market Rules (WEM Rules).
EOIs must be submitted to AEMO by 5:00pm (Australian Western Standard Time), Friday 1 March 2024.
Previous Expressions of Interest
-
2023
2023 Expressions of Interest
A Market Participant must submit an Expression of Interest (EOI) as a condition of being eligible to seek certification of Reserve Capacity under section 4.8.2 of the Wholesale Electricity Market Rules (WEM Rules) for any new capacity, which includes an upgrade of a Facility, in the 2023 Reserve Capacity Cycle for the 2025-26 Capacity Year.
EOIs, including all supporting documentation, must be submitted to AEMO by 5:00 PM (Australian Western Standard Time [AWST]) on 1 March 2023. -
2022
2022 Facility Class Assessment
A Market Participant with a Registered Facility for which any of the conditions under section 1.45.4 of the WEM Rules apply, must seek an assessment for an applicable RCM Facility Class in accordance with the timeframe and processes specified in the WEM Procedure under clause 4.8A.7. Applications must be made using the form below.
A person intending to participate in the 2022 Reserve Capacity Cycle with a facility that is unregistered as at the New RCM Transition Date, must under section 1.45.8 of the WEM Rules apply to AEMO for an indicative Facility Class and an indicative Facility Technology Type in accordance with the WEM Procedure specified in clause 4.8A.7. Applications must be made using the form below.
-
2021
-
2020
-
2019
-
2018
-
2017
-
2015 and 2016
-
2014
-
2013
-
2012
-
2011
-