Queensland
Please find below the retail market procedures and the industry technical documents. These documents describe the obligations that participants must follow in terms of the information that is exchanged between registered stakeholders. This page also contains guidelines and forms.
-
Procedures
-
Technical Documents
Technical protocols
Queensland Gas Interface Protocol (GIP) and Participant Build Pack 4
Queensland Specific Participant Build Pack (Participant Build Pack 4) defines the behaviour of the business and IT systems. The Queensland Retail Market uses all the interfaces described in Participant Build Pack 1, 2 and 3 unless otherwise specified in Participant Build Pack 4.
-
Guidelines
-
19/01/2018
Queensland CTM MIRN Allocation
16.41 KB -
18/08/2010
General Procedure Monitoring the Balance between Injections and Withdrawals
81.7 KB -
21/03/2011
QLD Gas Retail Market Procedure to Validate Aggregated Injections Received from Retailers v4.0
149.68 KB -
18/07/2022
Postcode Withdrawal Zone Mapping
Effective July 2022
651.22 KB -
17/06/2021
Queensland HV Zone to CTM Mapping
Effective 1 June 2021
446.78 KB -
29/06/2016
General Procedure for Interval Meter Notifications
Effective 18 August 2010
303.37 KB -
29/06/2016
Sample settlement statements
184.28 KB
-
-
Forms
For previous versions of documents, or more information, please contact the AEMO Information & Support Hub.