Primary frequency response
Primary frequency response requirements
2024 Primary Frequency Response Requirements Consultation
Following an AEMC rule change made on 7 March 2024 (Clarifying mandatory primary frequency response obligations for bidirectional plant), AEMO consulted on required updates to the Primary Frequency Response Requirements in accordance with clause 4.4.2A of the National Electricity Rules.
To view consultation documents, please visit:
PFRR Background
On 26 March 2020, the Australian Energy Market Commission (AEMC) made a final rule to require all scheduled and semi-scheduled generators in the NEM to support the secure operation of the power system by responding automatically to changes in power system frequency.
Stable frequency is an important part of maintaining a secure power system. Frequency varies whenever electricity supply does not exactly match consumer demand and uncontrolled changes in frequency can cause blackouts.
This rule change is part of the ongoing Frequency control work plan which has been developed by the Energy Security Board (ESB) and market bodies which sets out a series of actions that Australian Energy Market Operator (AEMO), the AEMC and the Australian Energy Regulator (AER) are undertaking to review and reform the frequency control frameworks in the NEM.
Key aspects of the final rule include:
- all scheduled and semi-scheduled generators, who have received a dispatch instruction to generate to a volume greater than 0 MW, must operate their plant in accordance with the performance parameters set out in the Primary frequency response requirements (PFRR) as applicable to that plant
- AEMO must consult on and publish the PFRR, which will specify the required performance criteria for generator frequency response, which may vary by plant type.
- Generators may request and AEMO may approve variations or exemptions to the PFRR for individual generating plant.
2020 Primary Frequency Response Requirements document consultation
Consultation on the Final Primary Frequency Response Requirements Document is now complete. This consultation was conducted under clauses 11.112.2(b) of the National Electricity Rules (NER).
To view submissions, issue papers and reports, please visit:
2020 Primary frequency response requirements documents
-
2024
-
2023
-
2020
-
27/11/2020
PFR Implementation Update
1.65 MB -
27/11/2020
AEMO Frequency Control Work Plan Update
424.42 KB -
27/11/2020
2021 MASS Review Update
215.88 KB -
01/06/2020
Interim primary frequency response requirements
Effective from 4 June 2020
601.22 KB -
01/06/2020
PFRR - Appendix A Self assessment
72.33 KB -
01/06/2020
PFRR - Appendix B New connection
68.79 KB -
01/06/2020
PFRR - Appendix D Application for exemption
68.77 KB -
01/06/2020
PFRR - Appendix E Application for variation
68.72 KB
-
Implementation of the Mandatory Primary Frequency Response Rule – status update
-
2023
-
2022
-
2021
-
18/11/2021
PFR Implementation 18/11/21
1.22 MB -
05/10/2021
PFR Implementation 05/10/21
940.69 KB -
30/08/2021
PFR Implementation 30/8/21
928.95 KB -
26/07/2021
PFR Implementation 26/7/21
913.37 KB -
28/06/2021
PFR Implementation 28/6/21
905.69 KB -
19/05/2021
PFR Implementation 19/5/21
891.98 KB -
14/04/2021
PFR Implementation 14/04/21
884.52 KB -
16/03/2021
PFR Implementation 16/03/21
864.34 KB -
17/02/2021
PFR Implementation 17/2/21
840.19 KB -
21/01/2021
PFR Implementation 21/01/21
865.69 KB
-
-
2020
-
16/12/2020
PFR Implementation 15/12/20
828.68 KB -
30/11/2020
PFR Implementation 27/11/20
788.1 KB -
09/11/2020
PFR Implementation 06/11/20
703.9 KB -
26/10/2020
PFR Implementation 23/10/20
581.59 KB -
12/10/2020
PFR Implementation 12/10/20
592.61 KB -
28/09/2020
PFR Implementation 28/09/20
465.84 KB -
14/09/2020
PFR Implementation 11/09/20
486.08 KB -
31/08/2020
PFR Implementation 28/8/20
443.63 KB -
13/08/2020
PFR Implementation 11/8/20
444.87 KB -
30/07/2020
PFR Implementation 17/7/20
210.45 KB
-