Metering package 2: MSATS and SLPs
The publication of the Final Report and Determination (Final Report) concludes the Rules consultation process conducted by the Australian Energy Market Operator (AEMO).
For more information on the Metering Procedures Packages and associated consultation, see the 5MS Metering Procedures Packages factsheets (308 KB, pdf).
Link to Consultation: Metering Procedure Changes (Package 2)
Status: Final determination published
Any queries should be directed to AEMO's Five-Minute Settlement email address: 5MS@aemo.com.au
Indicative Consultation Dates | |
Publish consultation paper | 20 May 2019 |
Submissions due | 24 June 2019 |
Publish draft procedure and draft determination | 5 August 2019 |
Submissions due on Draft Report | 2 September 2019 |
Publish final procedure and final determination | 30 September 2019 |
High Level Impact Assessment |
HLIA - Metering Data Management (MDM) Procedures (82 KB, docx) |
HLIA - MDM File Format and Load Process (82 KB, docx) |
HLIA - National Metering Identifier (82 KB, docx) |
HLIA - CATS Procedures Principles and Obligations (82 KB, docx |
HLIA - Procedures for the Management of WIGS NMIS (82 KB, docx) |
HLIA - Metrology Procedure Part A (83 KB, docx) |
HLIA - Metrology Procedure Part B (83 KB, docx) |
Exemption Procedure - Metering Provider Data Storage Requirements – new procedure to be developed |
HLIA - Service Level Procedure: Metering Data Provider Services (82 KB, docx) |
HLIA - Service Level Procedure: Metering Provider Services (82 KB, docx) |
HLIA - Retail Electricity Market Glossary and Framework (81 KB, docx) |