Metering package 3: Miscellaneous
Overview: this package contains a range of metering related documents which have been updated to reflect changes associated to the introduction of the Five-minute Settlements and Global Settlement Rules. NER 8.9 consultation processes do not apply to these documents. Documents in this package were released for a single round of comment only.
Status: Final documents published.
Link to Consultation: Five-Minute Settlement – Metering Procedure Changes (Package 3)
Key dates (Rules consultation not required) | |
Release draft procedures for comment | 30 August 2019 |
Comments due | 20 September 2019 |
Publish final procedures | 31 October 2019 |