AEMO is making changes to its market systems to implement the WDR rule. The table sets out the key WDR changes to AEMO’s market systems and their timing.
Retail | MSATS B2M | Create the DRSP role in retail systems | June 2021 |
MSATS B2B | Enable B2B accreditation of DRSPs | June 2021 | |
Wholesale | Registrations | Enable participants to register as a DRSP and perform classification and aggregation for NMIs. | June 2021 |
EMMS:. Settlements |
• Enable WDRU energy to be settled, billed and invoiced. • Generate reconciliation reports. |
October 2021 | |
EMMS:. Bidding and dispatch |
• Enable WDRU energy to be dispatched and forecasted. . • Changes are required to bid submissions, dispatch, pre-dispatch, MT PASA, ST PASA and operational forecasting |
October 2021 | |
New | Portfolio Management System (Release 1) |
AEMO to: • Establish an operational database of NMIs under assessment for or classified and aggregated as WDR units. • Upload a participant provided CSV files with NMI details that have a series of auto-validations and assessments applied. • Review and approve NMI baseline eligibility based on assessments called on from the baseline system |
June 2021 |
Portfolio Management System (Release 2) | Enable participants to classify and manage their WDR portfolios (including aggregations). | October 2021 | |
Baselining |
Enable PoL (predictability of load) and baseline calculations of NMIs for DRSPs. . Generate Baseline calculation reports. |
October 2021 |