Procedure Change- PPCL0014
- Type: Standard Procedure Change Process
- Submitter: System Management
- Title: Power System Operation Procedure: Dispatch
- Date Submitted: 27 November 2009
- Date First Published on the IMO Website: 30 November 2009
- Current Status: Closed. The amended PSOP commenced 1 March 2010.
Event | Date | Comments |
---|---|---|
Procedure Change Proposal Published | 27/11/2009 | |
Submission Period | 30/11/2009 - 30/12/2009 | The submission period is 20 Business Days from the date the IMO published the notification. |
Procedure Change Report | 05/01/2010 | Can be published any time after the end of the submission period. |
The IMO's decision published | 19/01/2010 | The IMO must publish its decision on the Procedure Change Report within 10 Business Days of publishing the report. |
Amended Procedure Commences | 01/03/2010 |
Documents related to this Procedure Change Proposal
Procedure Change Proposal [58kB]
Proposed Amended Procedure [172kB]
Procedure Change Report [86kB]
Final Amended Procedure [158kB]
The IMO's decision [457kB]
Submissions recieved during public consultation period
Alinta [60kB]
Landfill Gas & Power [104kB]