Procedure Change- PPCL0015
- Type: Standard Procedure Change Process
- Submitter: System Management
- Title: Power System Operation Procedure: Dispatch
- Date Submitted: 13 January 2010
- Date First Published on the IMO Website: 22 January 2010
- Current Status: Closed. The amended PSOP commenced 1 April 2010.
Event | Date | Comments |
---|---|---|
Procedure Change Proposal published | 22/01/2010 | |
Submission Period | 22/01/2010 - 19/02/2010 | The submission period is 20 Business Days from the date the IMO published the notification. |
Procedure Change Report | 05/03/2010 | Can be published any time after the end of the submission period. |
The IMO's decision published | 19/03/2010 | The IMO must publish its decision on the Procedure Change Report within 10 Business Days of publishing the report. |
Amended Procedure Commenced | 1/04/2010 | This date for commencement has been approved by the IMO. |
Documents related to this Procedure Change Proposal
Procedure Change Proposal [48kB]
Proposed Amended Procedure [155kB]
Procedure Change Report [91kB]
Final Proposed Amended Procedure [161kB]
The IMO's Decision [874kB]
Submissions received during the Public Consultation Process
Alinta [67kB]
Landfill Gas and Power [104kB]
Perth Energy [117kB]